Daikin EMRQ12ABY1 [12/36] Handling and unpacking the unit
![Daikin EMRQ12ABY1 [12/36] Handling and unpacking the unit](/views2/1764113/page12/bgc.png)
Installation manual
9
EMRQ8~16ABY1
Daikin Altherma outdoor unit
4P501819-1 – 2017.08
7.2. Service space
The space around the unit is adequate for servicing and the minimum
space for air inlet and air outlet is available. (Refer to the figure below
and choose one of the possibilities).
(distances shown are in mm)
■ In case of an installation site where sides A+B+C+D have
obstacles, the wall heights of sides A+C have no impact on
service space dimensions. Refer to the figure above for
impact of wall heights of sides B+D on service space
dimensions.
■ In case of an installation site where only the sides A+B have
obstacles, the wall heights have no influence on any
indicated service space dimensions.
■ The installation space required on these drawings are for full
load heating operation without considering possible ice
accumulation.
If the location of the installation is in a cold climate, then all
dimensions above should be >500 mm to avoid accumulation
of ice in between the outdoor units.
8. INSPECTING, HANDLING AND UNPACKING
THE UNIT
8.1. Inspection
At delivery, the unit must be checked and any damage must be
reported immediately to the carrier’s claims agent.
8.2. Handling
When handling the unit, take into account the following:
1 Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor
damage.
2 Choose on beforehand the path along which the unit is to be
brought in.
3 Bring the unit as close as possible to its final installation position
in its original package to prevent damage during transport.
4 Lift the unit preferably with a crane and 2 belts of at least 8 m
long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention
to the position of the unit's centre of gravity.
A forklift can only be used for transport as long as the unit
remains on its pallet as shown above.
A B C D Sides along the installation site with obstacles
Suction side
b
ac
d
ac
b
d
e e
ac
b
f
e
d
ac
b
d
e
b
h
1
h
2
1500
500
a ≥10 mm
b ≥300 mm
c ≥10 mm
d ≥500 mm
a ≥50 mm
b ≥100 mm
c ≥50 mm
d ≥500 mm
a ≥200 mm
b ≥300 mm
a ≥10 mm
b ≥300 mm
c ≥10 mm
d ≥500 mm
e ≥20 mm
a ≥50 mm
b ≥100 mm
c ≥50 mm
d ≥500 mm
e ≥100 mm
a ≥200 mm
b ≥300 mm
e ≥400 mm
a ≥10 mm
b ≥300 mm
c ≥10 mm
d ≥500 mm
e ≥20 mm
f ≥600 mm
a ≥50 mm
b ≥100 mm
c ≥50 mm
d ≥500 mm
e ≥100 mm
f ≥500 mm
a ≥10 mm
b ≥300 mm
c ≥10 mm
d ≥500 mm
e ≥20 mm
a ≥50 mm
b ≥100 mm
c ≥50 mm
d ≥500 mm
e ≥100 mm
1 Packaging material
2 Belt sling
3 Opening
4 Protector
NOTE
Use a belt sling of ≤20 mm wide that adequately
bears the weight of the unit.
1
4
2
2
4
4
3
2
34
4PEN501819-1.book Page 9 Wednesday, September 13, 2017 12:52 PM
Содержание
- Daikin altherma outdoor unit 1
- Installation manual 1
- Ce atitikties deklaracija ce atbilstības deklarācija ce vyhlásenie zhody ce uyumluluk beyani 2
- Ce declaracion de conformidad ce dichiarazione di conformita ce h ø h ymmopºø h 2
- Ce declaration of conformity ce konformitätserklärung ce declaration de conformite ce conformiteitsverklaring 2
- Ce declaração de conformidade се заявление о соответствии ce opfyldelseserklæring 2
- Ce erklæring om samsvar ce ilmoitus yhdenmukaisuudesta ce prohlášení o shodě 2
- Ce i zjava o skladnosti ce vastavusdeklaratsioon ce декларация за съответствие 2
- Ce izjava o usklađenosti ce megfelelőségi nyilatkozat ce deklaracja zgodności ce declaraţie de conformitate 2
- Daikin europe n v 2
- Daikin europe n v hat die berechtigung die technische konstruktionsakte zusammenzustellen 2
- Daikin europe n v ma upoważnienie do zbierania i opracowywania dokumentacji konstrukcyjnej 2
- Daikin europe n v â ó è âíô ûèô ôùëì óë ó û óù íâè ùôó â óèîfi ê îâïô î ù ûîâ 2
- Daikin europe n v е оторизирана да състави акта за техническа конструкция 2
- Emrq8aby1 emrq10aby1 emrq12aby1 emrq14aby1 emrq16aby1 2
- En60335 2 40 2
- Irányelv ek és módosításaik rendelkezéseit 2
- Machinery 2006 42 ec electromagnetic compatibility 2014 30 eu pressure equipment 2014 68 eu 2
- Pw40200 17v 2
- Компания daikin europe n v уполномочена составить комплект технической документации 2
- 40 bar 3
- Ankstesnio puslapio tęsinys 3
- Ce atitikties deklaracija ce atbilstības deklarācija ce vyhlásenie zhody ce uyumluluk beyani 3
- Ce declaracion de conformidad ce dichiarazione di conformita ce h ø h ymmopºø h 3
- Ce declaration of conformity ce konformitätserklärung ce declaration de conformite ce conformiteitsverklaring 3
- Ce declaração de conformidade се заявление о соответствии ce opfyldelseserklæring 3
- Ce erklæring om samsvar ce ilmoitus yhdenmukaisuudesta ce prohlášení o shodě 3
- Ce i zjava o skladnosti ce vastavusdeklaratsioon ce декларация за съответствие 3
- Ce izjava o usklađenosti ce megfelelőségi nyilatkozat ce deklaracja zgodności ce declaraţie de conformitate 3
- Ciąg dalszy z poprzedniej strony 3
- Continua dalla pagina precedente 3
- Continuación de la página anterior 3
- Continuarea paginii anterioare 3
- Continuation of previous page 3
- Continuação da página anterior 3
- Eelmise lehekülje järg 3
- Folytatás az előző oldalról 3
- Fortsat fra forrige side 3
- Fortsettelse fra forrige side 3
- Fortsetzung der vorherigen seite 3
- Fortsättning från föregående sida 3
- Iepriekšējās lappuses turpinājums 3
- Jatkoa edelliseltä sivulta 3
- Nadaljevanje s prejšnje strani 3
- Nastavak s prethodne stranice 3
- Pokračovanie z predchádzajúcej strany 3
- Pokračování z předchozí strany 3
- Ps 40 bar 3
- Pw40200 17v 3
- Shigeki morita director ostend 1st of september 2017 3
- Suite de la page précédente 3
- Tsmax 63 c 3
- Tsmin 30 c 3
- Vervolg van vorige pagina 3
- Önceki sayfadan devam 3
- Û ó âè fi ùëó úôëáô ìâóë ûâï 3
- Продолжение предыдущей страниц 3
- Продължение от предходната страница 3
- Installation manual 4
- Ontents 4
- Afety precautions 5
- Efinitions 5
- General information 5
- Ntroduction 5
- Accessories supplied with this unit 6
- Ccessories 6
- Combination and options 6
- Model identification 6
- Scope of the manual 6
- Opening the unit 7
- Verview of unit 7
- Main components in the unit 8
- Electrical component box left switch box 9
- Electrical component box right switch box 9
- Main components in the switch box 9
- Electing an installation location 10
- General precautions on installation location 10
- Dimensions of outdoor unit 11
- Imensions and service space 11
- Selecting a location in cold climates 11
- Weather dependent precautions 11
- Handling 12
- Handling and unpacking the unit 12
- Inspection 12
- Nspectin 12
- Service space 12
- Installing the unit 13
- Unpacking 13
- Efrigerant pipe size and allowable pipe length 14
- Selection of piping material 14
- Selection of piping size 14
- Maximum allowable height difference 15
- Maximum allowable lengths 15
- Piping length restrictions 15
- Refrigerant refnets 15
- Selection of refrigerant branch kits 15
- System piping limitations 15
- Caution for brazing 16
- Connecting the refrigerant piping 16
- Recautions on refrigerant piping 16
- Cautions on handling the service port 19
- Cautions on handling the stop valve 19
- Cautions on handling the stop valve cover 19
- General guidelines 19
- Guidelines for handling stop valve 19
- How to use the stop valve 19
- Leak test and vacuum drying 19
- Tightening torques 19
- Installation of refrigerant piping leak test vacuuming after electrical installation is done on any indoor or outdoor unit 20
- Installation of refrigerant piping leak test vacuuming before electrical installation is done regular installation method 20
- Set up 20
- Ipe insulation 21
- Leak test 21
- Vacuum drying 21
- Internal wiring parts table 22
- Lectrical wiring work 22
- Precautions on electrical wiring work 22
- Requirements 23
- Routing 23
- System overview of field wiring 23
- Transmission wiring routing 23
- Connection 24
- Power supply routing 24
- Precautions when knocking out knock out holes 24
- Harging refrigerant 25
- Precautions 25
- Calculating the additional refrigerant charge 26
- Fill in the label as follows 26
- Important information regarding the refrigerant used 26
- Method for adding refrigerant 26
- Precautions when adding refrigerant 26
- Charging method 27
- Checks after adding refrigerant 27
- W x w x w x x 27
- W x x x x c x 27
- W x x x x x c 27
- Checks before initial start up 28
- Field settings 28
- How to operate the push buttons 28
- Up and configuration 28
- Field settings by push buttons 29
- Precautions before starting test operation 29
- Test operation 29
- W x w x x w x 29
- W x x x x c x 29
- W x x x x x c 29
- X x w x x x x 29
- Test operation 30
- X w w x x x x 30
- X x w x x x x 30
- A2p a2p 31
- Aintenance and service 31
- Peration of the unit 31
- Aution for refrigerant leaks 32
- Introduction 32
- Maximum concentration level 32
- Refrigerant recovery operation method 32
- Service mode operation 32
- Vacuum method 32
- W x w x w x w 32
- W x x x x c x 32
- W x x x x x c 32
- Isposal requirements 33
- Nit specifications 33
- Copyright 2017 daikin 36
- P501819 1 36
Похожие устройства
- Daikin EMRQ14ABY1 Инструкция по монтажу
- Daikin EMRQ16ABY1 Инструкция по монтажу
- Daikin ERAD120E-SL Инструкция по эксплуатации
- Daikin ERAD140E-SL Инструкция по эксплуатации
- Daikin ERAD160E-SL Инструкция по эксплуатации
- Daikin ERAD160E-SL Инструкция по монтажу
- Daikin ERAD190E-SL Инструкция по эксплуатации
- Daikin ERAD190E-SL Инструкция по монтажу
- Daikin ERAD210E-SL Инструкция по эксплуатации
- Daikin ERAD210E-SL Инструкция по монтажу
- Daikin ERAD240E-SL Инструкция по эксплуатации
- Daikin ERAD240E-SL Инструкция по монтажу
- Daikin ERAD300E-SL Инструкция по эксплуатации
- Daikin ERAD300E-SL Инструкция по монтажу
- Daikin ERAD350E-SL Инструкция по эксплуатации
- Daikin ERAD350E-SL Инструкция по монтажу
- Daikin ERAD410E-SL Инструкция по эксплуатации
- Daikin ERAD410E-SL Инструкция по монтажу
- Daikin ERAD460E-SL Инструкция по эксплуатации
- Daikin ERAD460E-SL Инструкция по монтажу