Daikin RRLQ014CAW1 — проверка и обслуживание систем отопления и охлаждения [13/20]
![Daikin RRLQ016CAW1 [13/20] X certificates](/views2/1787381/page13/bgd.png)
3 x Certificates
BH ROTEX HPSU/HPU - 11/2014
13
17th maintenance
18th maintenance
Activities Yes No Comments
1. All maintenance and inspection tasks completed in accordance with
installation and maintenance instructions for the ROTEX HPSU/HPU?
2. System water pressure checked?
bar
3. Leak test with leak indicator (
≤5 g/a) completed in accordance with F-
Gases Decree (see Chapter 1.2 "Legal stipulations", Page 3)
Leak indicator
instrument
Manufacturer:
Type:
Date of last instrument test:
_______________________________
_______________________________
_______________________________
4. Work on coolant circuit completed?
Reason:
5. Weight of coolant added:
kg (R410A)
kg (R134a)
Weight of coolant disposed of: kg (R410A)
kg (R134a)
6. Function check carried out?
7. Any faults detected?
Faults detected:
Fault rectified? (see repair log page _____)
8. Operator informed of existing faults?
Company stamp / company address Name of technician in capitals Date Signature of technician
Activities Yes No Comments
1. All maintenance and inspection tasks completed in accordance with
installation and maintenance instructions for the ROTEX HPSU/HPU?
2. System water pressure checked?
bar
3. Leak test with leak indicator (
≤5 g/a) completed in accordance with F-
Gases Decree (see Chapter 1.2 "Legal stipulations", Page 3)
Leak indicator
instrument
Manufacturer:
Type:
Date of last instrument test:
_______________________________
_______________________________
_______________________________
4. Work on coolant circuit completed?
Reason:
5. Weight of coolant added:
kg (R410A)
kg (R134a)
Weight of coolant disposed of: kg (R410A)
kg (R134a)
6. Function check carried out?
7. Any faults detected?
Faults detected:
Fault rectified? (see repair log page _____)
8. Operator informed of existing faults?
Company stamp / company address Name of technician in capitals Date Signature of technician
Содержание
- Operating manual p.1
- Rotex heat pumps p.1
- Gb issued 11 2014 p.1
- For the operator p.1
- X general instructions p.3
- Legal stipulations p.3
- Guarantee conditions p.3
- General instructions p.3
- X system data p.4
- Total fill weight p.4
- System data p.4
- System p.4
- Operator p.4
- Leak test p.4
- Internal unit p.4
- External unit p.4
- X certificates p.5
- St maintenance p.5
- Nd maintenance p.5
- Certificates p.5
- X certificates p.6
- Th maintenance p.6
- Rd maintenance p.6
- X certificates p.7
- Th maintenance p.7
- X certificates p.8
- Th maintenance p.8
- X certificates p.9
- Th maintenance p.9
- X certificates p.10
- Th maintenance p.10
- X certificates p.11
- Th maintenance p.11
- X certificates p.12
- Th maintenance p.12
- Th maintenance p.13
- X certificates p.13
- X repair logs p.14
- Repair logs p.14
- X repair logs p.15
- X repair logs p.16
- X repair logs p.17
- X repair logs p.18
Похожие устройства
-
Daikin RRLQ016CAW1Руководство по применению для установщика -
Daikin RRLQ016CAW1Инструкция по монтажу -
Daikin RRLQ016CAW1Инструкция по эксплуатации -
Daikin RRLQ014CAW1Руководство по применению для установщика -
Daikin RRLQ014CAW1Инструкция по монтажу -
Daikin RRLQ011CAW1Руководство по применению для установщика -
Daikin RRLQ011CAW1Инструкция по монтажу -
Daikin RRLQ011CAW1Инструкция по эксплуатации -
Daikin RRLQ008CAV3Руководство по применению для установщика -
Daikin RRLQ008CAV3Инструкция по монтажу -
Daikin RRLQ008CAV3Инструкция по эксплуатации -
Daikin RRLQ006CAV3Руководство по применению для установщика
Узнайте о важности регулярного обслуживания систем отопления и охлаждения. Проверьте выполнение всех необходимых задач и соблюдение инструкций для надежной работы.