Daikin EKHWMXB300CA [6/68] X safety

Daikin EKHWMX500CA [6/68] X safety
2 x Safety
Installation and maintenance instructions
6
Daikin Altherma M ECH
2
O
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
2.4.3 Site of installation
For safe and fault-free operation, the installation
location of the Daikin Altherma M ECH
2
O must
meet certain criteria. Information on this can be
found in chap. 4.2.
Information on the installation site of other com-
ponents can be found in the associated docu-
mentation supplied with them.
2.4.4 Heating system and sanitary
connection
The domestic water quality must comply
with the EU Guideline 98/83 EC and the
regionaly-applicable regulations.
Create a heating system according to the
safety requirements of EN 12828.
With a sanitary connection you must comply
with
–E
N 1717 – Protection against pollution of
potable water installations and general
requirements of devices to prevent pollu-
tion by backflow
–EN 806 – Specifications for installations
inside buildings conveying water for human
consumption
and, in addition, the country-specific legal
regulations.
The connection of a solar installation, an electric
heating rod or an alternative heat generator may
cause the storage temperature to exceed 60 °C.
Scalding protection (e.g. VTA32 + Screw
set
1") must therefore be fitted during instal-
lation.
If the Daikin Altherma M ECH
2
O is connected to
a heating system with steel pipes, radiators or
non-diffusion-proof floor heating pipes, sludge
and swarf can enter the hot water storage tank
and cause blockages, local overheating or
corrosion damage.
To prevent possible damage, fit a dirt filter or
sludge separator into the heating return flow
of the system.
SAS 1
The dirt filter must be cleaned at regular
intervals.
2.4.5 Demands on the heating and pressure-
free storage water
Observe the relevant regulations of technology
to prevent creation of corrosion products and de-
posits.
Minimum requirements regarding the quality
of filling and supplementary water:
Water hardness (calcium and magnesium,
calculated as calcium carbonate):
3 mmol/l
Conductivity: 1500 (ideal: 100) μS/cm
Chloride: 250 mg/l
Sulphate: 250 mg/l
pH-values (heating water): 6.5 - 8.5
Using filling water and top-up water which does
not meet the stated quality requirements can
cause a considerably reduced service life of the
equipment. The responsibility for this lies solely
with the operator.
2.4.6 Operation
The Daikin Altherma M ECH
2
O:
Do not operate until all installation and
connection work is completed.
Only operate with a completely full storage
tank (Level indicator) and heating circuit.
Operate at a maximum pressure of 3 bar.
Only connect with a pressure reducer on the
external water supply (supply line).
only operate if the protective cover is installed.
The specified servicing intervals should be
adhered to and inspection work must be car-
ried out.
2.4.7 Instruct the owner
Before you hand over the Daikin Altherma M
ECH
2
O, explain to the user how to operate
and check the system.
If a pressurised solar system or optional
external heat source is connected to the
system via the corrugated-tube heat ex-
changer (Bild 3-1 and Bild 3-2, item 14),
then these minimum requirements also
apply to the fill and top-up water for this
heating circuit.

Содержание

Скачать