Daikin EKOMBG22AAV1 [39/56] Parameter settings via the service code
![Daikin EKOMBG22AAV1 [39/56] Parameter settings via the service code](/views2/1796817/page39/bg27.png)
Daikin Europe NV
39
7.2 Parameter settings via the service code
The parameters of the boiler controller have been configured in the factory in accordance with the following
table.
These parameters can only be changed with the service code. Take the following actions to
activate the program memory:
1. Press the and the button simultaneously, until a
0
appears on the service display and a
0
on the temperature display.
2. Use the button to enter
15
(service code) on the temperature display.
3. Use the button to set the parameter you wish to configure, on the service display.
4. Use the and button to set the parameter to the required value (visible) on the temperature display.
5. After all the required changes have been entered, press the button until
P
appears on the service display.
The boiler controller has now been reprogrammed.
Note
Pressing the button will take you out of the menu without saving the parameter changes.
Example: Change maximum CH power
1. Press the and the button simultaneously.
2. Use the button to go to
15
.
3. Press the button 3 x. 60 and 3 will appear on the display.
4. Use the button to change the 60 to 70.
5. Press the button until
P
appears.
6. The change has now been implemented. The maximum CH power has been increased from 60 to 70 %.
EKOMBG*AAV1
Parameter
Description
22
28
33
Settings reach
0
Service code
[15]
-
-
-
Access to installers settings, the service code must be
entered (=15)
1
Installation
type
0
0
0
0= combi
1= Solo EKOMBG22AAV1 + boiler
2= Tap (hot water only)
3= Solo
2
CH pump setting
0
0
0
0=
pump post
-
running time active
1= pump continuously active
2= not applicable
3= not applicable
3
Set maximum CH power
60
60
60
Setting reach set value parameter c up to 100%
(100 % = 99 + 1x )
3.
Maximum capacity modulating CH pump
80
80
80
Setting reach set value parameter c
.
up to 100%
4
Set maximum hot water power
99
99
99
Setting reach set value parameter d up to 100%
5
Min. leaving water temperature of the fuel
line
25
25
25
Setting reach 10°C to set value parameter 5
5.
Max setting value leaving water
temperature via operating panel
90
90
90
Setting reach 30°C to 90°C
6
Min.
outdoor
temperature of the fuel line
-
7
-
7
-
7
Setting reach
-
9 to 10°C
7
Max.
outdoor
temperature of the fuel line
25
25
25
Setting reach 15°C to 30°C
8
CH pump post
-
running time after CH
operation
1
1
1
Setting reach 0 to 15 minutes
9
CH pump post
-
running time after boiler
operation
1
1
1
Setting reach 0 to 15 minutes (n/a to Combi unit)
A
Setting three
-
way valve or electrical valve
0
0
0
0= powered during CH operation
1= powered during hot water operation and rest
2= powered during every heat request (CH, hot water and
continuous heating function)
3= group regulation
4= External DHW tank pump
Содержание
- Ekombg22aav1 ekombg28aav1 ekombg33aav1 1
- Daikin europe n v 2
- Ekombg22aav1 ekombg28aav1 ekombg33aav1 ekomb22aav1 ekomb28aav1 ekomb33aav1 2
- En60335 2 4 2
- Low voltage 2006 95 ec gas appliances 2009 142 ec boiler efficiency requirements 92 42 eec electromagnetic compatibility 2004 108 ec 2
- P369568 1 2
- Shigeki morita director ostend 3rd of march 2014 2
- Daikin europe nv 3 3
- Abbreviations and terms used 4
- Daikin europe nv 4 4
- Identification of the product 4
- Safety instructions 4
- Service and technical support for the installer 4
- Symbols 4
- These installation instructions 4
- Daikin europe nv 5 5
- Functioning 5
- General 5
- Operating modes 5
- Unit description 5
- Ch operation 6
- Daikin europe nv 6 6
- Domestic hot water operation 6
- Heating up unit 6
- Igniting 6
- Led on 6
- Selftest 6
- Ventilating 6
- Daikin europe nv 7 7
- Frost protection 7
- Pc interface 7
- Test programs 7
- Daikin europe nv 8 8
- Main components 8
- Accessories 9
- Daikin europe nv 9 9
- Boiler mounted directly to the wall 10
- Connections connections 10
- Daikin europe nv 10 10
- Installation 10
- Installation measurements 10
- Connections connections 11
- Daikin europe nv 11 11
- Unit connected to b pack 11
- Daikin europe nv 12 12
- Installation space 12
- Installing in kitchen cabinet 12
- Removing cover plate and front panel 12
- Assembling bottom connection set 13
- Assembling suspension strip and assembly bracket 13
- Assembly 13
- Daikin europe nv 13 13
- Apply cover plate optional 14
- Assembling the unit 14
- Daikin europe nv 14 14
- The nipples and pipes must not rotate with it 14
- Connecting 15
- Connecting ch installation 15
- Thermostatic radiator taps 15
- Underfloor heating 15
- Daikin europe nv 16 16
- Dividing ch installation in groups in case of additional heat sources 16
- Installation instructions 16
- Operating principle 16
- Underfloor heating without pump 16
- Connecting dhw installation 17
- Daikin europe nv 17 17
- Resistance graph tap circuit unit 17
- Connecting electronically 18
- Daikin europe nv 18 18
- Electrical connections 18
- Connect room thermostat 19
- Daikin europe nv 19 19
- Modulating room thermostat open therm 19
- Modulating room thermostat wireless 19
- Room thermostat on off 19
- Connecting gas 20
- Daikin europe nv 20 20
- Outdoor temperature sensor 20
- Concentric connection 60 100 21
- Concentric connection 80 125 21
- Daikin europe nv 21 21
- Flue gas output and air input 21
- Materials to be used 21
- Parallel connection 80 80 21
- Daikin europe nv 22 22
- Outlet systems 22
- Permitted pipe lengths in concentric flue tube systems 22
- Pipe lengths 22
- Replacement lengths 22
- Calculation example 23
- Daikin daikin 23
- Daikin daikin daikin daikin 23
- Daikin europe nv 23 23
- Passage materials and insulation 23
- Permitted pipe lengths at parallel air supply and flue tube systems 23
- Pt gr c13 all materials c33 all materials c53 all materials c43 all materials c63 all materials 1 1 c83 all materials c93 all materials 1 gas exhaust air intake parts can be bought from a 3rd party all parts purchased from an external supplier must comply with en14471 23
- Replacement lengths 23
- Supplier per country 23
- Combustion gas outlet and air supply pipe 24
- Daikin europe nv 24 24
- Double pipe feedthrough assembly 24
- General assembly 24
- Horizontal facade outlet double pipe feedthrough 24
- Permissible pipe length 24
- Assembly of double pipe extension pipe s for balcony gallery output 25
- Daikin europe nv 25 25
- Combustion gas outlet and air supply pipe 26
- Concentric feedthrough assembly 26
- Daikin europe nv 26 26
- Horizontal wall terminal 26
- Permitted pipe lengths 26
- Assembly horizontal roof terminal 27
- Assembly of combi extension pipe for balcony gallery outlet 27
- Daikin europe nv 27 27
- Assembly vertical roof terminal 28
- Combustion gas outlet and air supply pipe 28
- Daikin europe nv 28 28
- Permitted pipe length 28
- Vertical roof terminal and vertical double flue system 28
- Daikin europe nv 29 29
- Giveg exhaust hoo 29
- Vertical double pipe flue system 29
- Combustion gas outlet and air supply pipe 30
- Daikin europe nv 30 30
- Permitted pipe lengths at ø80 mm 30
- Prefab chimney assembly 30
- Roof outlet prefab chimney 30
- Assembly of vertical combustion gas outlet 31
- Combustion gas outlet and air supply pipe 31
- Daikin europe nv 31 31
- Horizontal air supply assembly 31
- Permitted pipe lengths at ø80 mm 31
- Roof outlet and air supply from the facade 31
- Air supply from the facade and a roof outlet with communal exhaust system 32
- Combustion gas outlet and air supply pipe 32
- Communal combustible gas outlet 32
- Daikin europe nv 32 32
- Permitted pipe length 32
- The minimum diameters of the communal output system based on vacuum 32
- Combined flue outlet air inlet system 33
- Combustion gas outlet and air supply pipe 33
- Daikin europe nv 33 33
- Permitted pipe length 33
- Combustion gas outlet and air supply pipe 34
- Concentric horizontal flue gas outlet vertical part air surrounded by shaft 34
- Daikin europe nv 34 34
- Permitted pipe length and system requirements 34
- Ch system 35
- Commissioning the unit and the installation 35
- Dhw provision 35
- Filling and air purge of unit and installation 35
- Gas supply 35
- Commissioning the unit 36
- Daikin europe nv 36 36
- Drain the unit and the installation if the mains electricity supply is interrupted and there is a risk of freezing 37
- Frost protection 37
- Switching off the unit 37
- Direct via operating panel 38
- Setting and adjustment 38
- Daikin europe nv 39 39
- Parameter settings via the service code 39
- Daikin europe nv 40 40
- Caution the power is slowly increased when the fire is lit and is lowered when the set leaving water temperature is reached modulation on tsupply 41
- Daikin europe nv 41 41
- Fuel line graph 41
- Pressure loss graph unit ch side 41
- Set pump capacity 41
- Setting maximum ch power 41
- This table shows the relation between the rpm of the fan and the unit power 41
- Weather dependent regulation 41
- Conversion to different type of gas 42
- Converting the dosing ring 42
- Daikin europe nv 42 42
- Gas air regulation 42
- Work on gas carrying parts may only be carried out by a certified installer 42
- Checking the carbon dioxide setting 43
- Daikin europe nv 43 43
- Ensure the start up procedure of the analysis machine has been completed before inserting the probe in the sample point 43
- Setting gas air regulation 43
- Wait for the gas boiler to run stable faulty measurements may occur if the measuring probe is connected before the boiler is running stable we recommend you wait for at least 30 minutes 43
- Adjusting the carbon dioxide setting 44
- Daikin europe nv 44 44
- Work on gas carrying parts may only be carried out by qualified competent individuals 44
- Daikin europe nv 45 45
- Malfunction codes 45
- Malfunctions 45
- Show last malfunction 45
- Boiler controller is noisy when igniting 46
- Boiler controller resonates 46
- Daikin europe nv 46 46
- No heating ch 46
- Ch is not reaching correct temperature 47
- Daikin europe nv 47 47
- Dhw is not reaching the correct temperature 47
- No domestic hot water 47
- The power is reduced 47
- A label pump led flashes intermittently red green 48
- A label pump led flashes red 48
- Ch installation stays warm unwanted 48
- Daikin europe nv 48 48
- Cleaning 49
- Daikin europe nv 49 49
- Disassembly 49
- Gasket contain ceramic fibers 49
- Maintenance 49
- Ntegrated insulation plate and 49
- Daikin europe nv 50 50
- Fitting 50
- Daikin europe nv 51 51
- Technical specifications 51
- Daikin europe nv 52 52
- Electrical diagram 52
- Daikin europe nv 53 53
- Ntc resistances 53
- Daikin europe nv 54 54
- The warranty is void if it is determined that the faults damages or undue wear are attributable to improper use or inexpert treatment or inexpert repair setting installation or maintenance by non certified installers or that it was exposed to substances with aggressive chemicals incl hair spray and other damaging substances the warranty also becomes void when pipes and couplings have been applied in the installation which may cause oxygen diffusion or the defect is a consequence of lime scale damaging to the unit and installation surface damage as well as transport damage is included under the warranty the entitlement to warranty becomes void if it cannot be proven that the ch boiler has been subjected to maintenance by a certified installer at least once a year from the commissioning date the instructions for installation and use which we provide for units must be followed in full 54
- Warranty conditions 54
Похожие устройства
- Daikin EKOMBG28AAV1 Инструкция по монтажу
- Daikin EKOMBG28ABV1 Руководство по монтажу
- Daikin EKOMBG33AAV1 Инструкция по монтажу
- Daikin EKOMBG33ABV1 Руководство по монтажу
- Daikin PDMK Инструкция по эксплуатации
- Daikin PGDK Инструкция по эксплуатации
- Daikin R2CND024A4AA Инструкция по эксплуатации
- Daikin R2CND024A4AA Инструкция по монтажу
- Daikin R2TND012A4AA Инструкция по эксплуатации
- Daikin R2TND012A4AA Инструкция по монтажу
- Daikin R2TND018A4AA Инструкция по эксплуатации
- Daikin R2TND024A4AA Инструкция по эксплуатации
- Daikin R2TND024A4AA Инструкция по монтажу
- Daikin R2TND018A4AA Инструкция по монтажу
- Samsung Galaxy Z Fold3 256GB Black (SM-F926B) Руководство пользователя
- Samsung Galaxy Z Flip3 128GB Beige (SM-F711B) Руководство пользователя
- Wolta STD ДПО13-36-101-4К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-101-4К Презентация
- Wolta STD ДПО13-36-101-5К Руководство по монтажу и эксплуатации
- Wolta STD ДПО13-36-101-5К Презентация