Daikin EHYKOMB33AA2A [36/44] Glossary
![Daikin EHYKOMB33AA2A [36/44] Glossary](/views2/1798425/page36/bg24.png)
13 Glossary
Installation and operation manual
36
EHYKOMB33A
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1K – 2020.10
12.3.6 Symptom: Space heating does NOT reach
the temperature
Possible causes Corrective action
Weather-dependent setpoint
setting is incorrect.
Check the setting on the user
interface and adjust if necessary.
Temperature is too low. Increase the space heating
temperature.
No circulation in the installation. Check whether there is
circulation. At least 2 or 3
radiators MUST be open.
The boiler power has NOT been
correctly set for the installation.
Adjust the power. See "Maximum
space heating power
setting"[428].
No heat transfer as a result of
lime scale or fouling in the heat
exchanger.
Descale or flush the heat
exchanger on the space heating
side.
12.3.7 Symptom: No domestic hot water
Not applicable for Switzerland
Possible causes Corrective action
The burner is NOT firing on
domestic hot water: S3 faulty.
Replace S3.
The burner does NOT ignite. See "12.3.1Symptom: The
burner does NOT ignite"[435].
12.3.8 Symptom: Hot water does NOT reach the
temperature (no tank installed)
Not applicable for Switzerland
Possible causes Corrective action
Domestic hot water flow is too
high.
Adjust the inlet assembly.
Temperature setting for water
circuit is too low.
Increase the domestic hot water
setpoint on the domestic hot
water homepage of the user
interface.
No heat transfer as a result of
lime scale or fouling in the heat
exchanger domestic hot water
side.
Descale or flush the exchanger
domestic hot water side.
Cold water temperature <10°C. The water inlet temperature is
too low.
The domestic hot water
temperature fluctuates between
hot and cold.
▪ The flow is too low. To
guarantee comfort, a minimum
water flow of 5 l/min is
recommended.
▪ Increase the domestic hot
water setpoint on the domestic
hot water homepage of the
user interface.
12.4 Solving problems based on error
codes
If the unit runs into a problem, the user interface displays an error
code. It is important to understand the problem and to take
measures before resetting an error code. This should be done by a
licensed installer or by your local dealer.
This chapter gives you an overview of all possible error codes and
their descriptions as they appear on the user interface.
For detailed troubleshooting of each error, see the service manual.
12.4.1 Error codes: Overview
Error codes of the gas boiler
The controller on the gas boiler detects faults and indicates them on
the display by error codes.
If the LED is flashing, the controller has detected a problem. Once
the problem is rectified, the controller can be restarted by pressing
the button.
Following table shows a list of error codes and the possible
solutions.
Error
code
Cause Possible solution
10, 11,
12, 13,
14
Sensor fault S1 ▪ Check wiring
▪ Replace S1
20, 21,
22, 23,
24
Sensor fault S2 ▪ Check wiring
▪ Replace S2
0 Sensor fault after
self-check
Replace S1 and/or S2
1 Temperature too
high
▪ Air in installation
▪ Pump is NOT running
▪ Insufficient flow in installation
▪ Radiators are closed
▪ Pump setting is too low
2 S1 and S2
interchanged
▪ Check cable set
▪ Replace S1 and S2
4 No flame signal ▪ Gas tap is closed
▪ No or incorrect ignition gap
▪ Gas supply pressure is too low or
fails
▪ Gas valve or ignition unit is NOT
powered
5 Poor flame signal ▪ Condensate drain blocked
▪ Check adjustment of gas valve
6 Flame detection
fault
▪ Replace ignition cable and spark
plug cap
▪ Replace ignition unit
▪ Replace boiler controller
8 Incorrect fan speed ▪ Fan catching on casing
▪ Wiring between fan and casing
▪ Check wiring for poor wire contact
▪ Replace fan
29, 30 Gas valve relay
fault
Replace boiler controller
13 Glossary
Dealer
Sales distributor for the product.
Содержание
- Daikin altherma hybrid heat pump gas boiler 1
- Ehykomb33aa 1
- Installation and operation manual 1
- Module 1
- Boiler efficiency requirements 92 42 eec 2
- Daikin europe n v 2
- Director 2
- Ehykomb33aa 2
- Electromagnetic compatibility 2014 30 eu 2
- En60335 2 102 2
- Gas appliance regulation 2016 426 eu 2
- Installation and operation manual 2
- Low voltage 2014 35 eu 2
- Ostend 21st of april 2018 2
- P369568 3h 2
- Shigeki morita 2
- About the box 8 3
- About the documentation 4 3
- About the product 3
- About the product 3 3
- About the units and options 9 3
- Benchmark checklist can be used to demonstrate compliance with building regulations and should be provided to the customer for future reference 3
- Benchmark places responsibilities on both manufacturers and installers the purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate building regulations the 3
- Commissioning 31 3
- Configuration 25 3
- Especially for uk 3
- General safety precautions 4 3
- Glossary 36 3
- Installation 12 3
- Maintenance and service 32 3
- Operation 30 3
- Preparation 11 3
- Table of contents 3
- Technical data 38 3
- The benchmark scheme 3
- Troubleshooting 35 3
- About the documentation 4
- About this document 4
- General safety precautions 4
- Meaning of warnings and symbols 4
- For the installer 5
- General 5
- General safety precautions 5
- Installation site 5
- Electrical 6
- General safety precautions 6
- Gas exhaust 7
- General safety precautions 7
- Local legislation 7
- About the box 8
- Gas boiler 8
- To remove the accessories from the gas boiler 8
- To unpack the gas boiler 8
- About the units and options 9
- Combining units and options 9
- Identification 9
- Identification label gas boiler 9
- Possible options for the gas boiler 9
- About the units and options 10
- Preparation 11
- Preparing the gas boiler installation 11
- Installation 12
- Mounting the gas boiler 12
- Opening the units 12
- To install the gas boiler 12
- To open the gas boiler 12
- To open the switch box cover of the gas boiler 12
- Condensate pipe work 13
- Installation 13
- Internal connections 13
- To install the condensate trap 13
- Condensate pump 14
- Connecting the water piping of the gas boiler 14
- Connecting water piping 14
- External connections 14
- Installation 14
- To connect the water piping for domestic hot water not applicable for switzerland 14
- Connecting the electrical wiring 15
- Flow resistance graph for appliance domestic hot water circuit 15
- Installation 15
- To connect the communication cable between gas boiler and indoor unit 15
- To connect the main power supply of the gas boiler 15
- To connect the water piping for domestic hot water applicable for switzerland 15
- To connect the water piping for space heating 15
- To fill the domestic water circuit of the gas boiler 15
- Connecting the gas piping 16
- Installation 16
- To connect the gas pipe 16
- Connecting the boiler to the flue gas system 17
- Installation 17
- To change the 60 100 concentric connection to a dual pipe connection 17
- To change the gas boiler to 80 125 concentric connection 17
- Appliance categories and pipe lengths 18
- Calculate the total piping length 18
- Installation 18
- Installation 19
- Applicable materials 20
- Installation 20
- Fitting a horizontal flue system 21
- Flue pipe position 21
- Installation 21
- Insulation of the gas exhaust and air intake 21
- Fitting a vertical flue system 22
- Flue gas materials c63 available on the market 22
- Flues in voids 22
- Installation 22
- Plume management kit 22
- About securing the flue system 23
- Installation 23
- 1000 mm 24
- 3 50 mm m 24
- Finishing the gas boiler installation 24
- Installation 24
- To close the gas boiler 24
- Basic configuration 25
- Configuration 25
- Domestic hot water comfort function 25
- Gas boiler 25
- Overview configuration 25
- To install the cover plate 25
- To reset the gas boiler 25
- To turn on off the gas boiler 25
- Configuration 26
- Domestic hot water temperature 26
- Frost protection function 26
- Keep hot function 26
- Maximum space heating supply temperature 26
- To set the parameters via the service code 26
- Configuration 27
- Configuration 28
- Frost protection function 28
- Maximum space heating power setting 28
- To change to a different type of gas 28
- About the co ₂ setting 29
- Configuration 29
- Domestic hot water 30
- Heating 30
- Operation 30
- Operation modes 30
- Overview operation 30
- Commissioning 31
- To perform a gas pressure test 31
- Maintenance and service 32
- Maintenance safety precautions 32
- Opening the gas boiler 32
- To disassemble the gas boiler 32
- To perform a test run on the gas boiler 32
- Maintenance and service 33
- Maintenance and service 34
- To assemble the gas boiler 34
- To clean the inside of the gas boiler 34
- General guidelines 35
- Precautions when troubleshooting 35
- Solving problems based on symptoms 35
- Symptom no space heating by the gas boiler 35
- Symptom the burner does not ignite 35
- Symptom the burner ignites noisily 35
- Symptom the burner resonates 35
- Symptom the power is reduced 35
- Troubleshooting 35
- Error codes of the gas boiler 36
- Error codes overview 36
- Glossary 36
- Solving problems based on error codes 36
- Symptom hot water does not reach the temperature no tank installed 36
- Symptom no domestic hot water 36
- Symptom space heating does not reach the temperature 36
- Glossary 37
- A subset of the latest technical data is available on the regional daikin website publicly accessible the full set of latest technical data is available on the daikin business portal authentication required 38
- Components 38
- Components gas boiler 38
- Technical data 38
- General 39
- Technical data 39
- Technical specifications 39
- Technical specifications gas boiler 39
- Wiring diagram 39
- Wiring diagram gas boiler 39
- Appliance category and supply pressure 40
- Technical data 40
- Technical data 41
- Daikin altherma hybrid heat pump gas boiler module 42
- Ehykomb33a 42
- Gas boiler system commissioning checklist 42
- Installation and operation manual 42
- P353067 1k 2020 0 42
- Technical data 42
- This commissioning checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate building regulations and then handed to the customer to keep for future reference 42
- Ehykomb33a daikin altherma hybrid heat pump gas boiler module 4p353067 1k 2020 0 43
- Installation and operation manual 43
- Service 01 43
- Service 02 43
- Service 03 43
- Service 04 43
- Service 05 43
- Service 06 43
- Service 07 43
- Service 08 43
- Service 09 43
- Service 10 43
- Service record 43
- Technical data 43
Похожие устройства
- Daikin EHYKOMB33AA2A Руководство по применению для установщика
- Daikin EHYKOMB33AA2A Справочное руководство для монтажника
- Daikin EHYKOMB33AA2 Руководство по эксплуатации
- Daikin EHYKOMB33AA2 Справочное руководство для монтажника
- Daikin EHYKOMB33AA2 Руководство по применению для установщика
- Daikin EHYKOMB33AA3 Руководство по эксплуатации
- Daikin EHYKOMB33AA3 Руководство по применению для установщика
- Daikin EHYKOMB33AA3 Справочное руководство для монтажника
- Daikin EKBALLV1 Инструкция по монтажу
- Daikin EKBPHT04JH Инструкция по монтажу
- Daikin EKDPH008C Инструкция по монтажу
- Daikin EKEPHYHT35H Инструкция по монтажу
- Daikin EKHY3PART Инструкция по монтажу
- Daikin EKHY075787 Инструкция по монтажу
- Daikin EKHY075787 Брошюра
- Daikin EKPS075867 Инструкция по монтажу
- Daikin EKPS075867 Брошюра
- Daikin EKPS075877 Инструкция по монтажу
- Daikin EKPS075877 Брошюра
- Daikin EKPS075917 Инструкция по монтажу