Haier AC242ACERA [51/408] Installation

Haier AD282AMERA [51/408] Installation
Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check
that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament
panel.
Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm.
First fix it with screws temporally.
Fasten the two temporally fixing screws and other
two, and tighten the four screws.
Connect the wires of synchro-motor.
Connect the wire of signal.
If no response of remote controller, check whether
the wiring is correct, restart remote controller 10
seconds after shut off power supply.
<Limits of panel board installation>
Install the panel board in the direction shown in the
figure. The incorrect direction will result in water
leakage, meanwhile swing and signal receiving are
displayed that cannot be connected.
(For series 122,182 )
POWER SUPPLY:
1PH, 220-230V~, 50Hz
123 LN
1 2 3
Electric
control
box
Y/G
Y/G
(2) Check if water drainage is smooth after installation.
Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.
After wiring
controller to operate the unit.
Note, in this operation, fan will be running.
Upon confirmation of a smooth water drainage, be sure to cut off power supply.
Check water drainage in cooling operation.
(For series 242, 282, 362, 422, 482, 602 )
When wiring is not complete
INDOOR UNIT
TERMINAL BLOCK
OUTDOOR UNIT
TERMINAL BLOCK
Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block, use
remote
For AB122ACEAA, AB122ACERA and AB182ACEAA
Installation
-45-

Содержание

Скачать