Haier AD18SL2VHB [10/38] Installation instructions

Содержание

Installation Instructions Step 2 Installation of the Slim Duct Unit A Determine and mark the position of where the Ducted unit is to be installed Install the hardware necessary to mount the threaded rods Always select a location strong enough to support the Slim Duct unit E Ream both inside and outside of the refrigerant tubing where a cut has been made Use every precaution to ensure reamed copper chips not to lodge inside the tubing Install the factory supplied flare nuts on the refrigerant tubing using an R 410A flaring tool ONLY Apply a small amount of refrigerant oil to the back of the flare and threads Tighten the flares with a torque wrench and back up wrench to the specifications found in the outdoor unit Installation Manual C Lift the Ducted unit and position the threaded rods into the 4 mounting clips one located on each corner of the unit F Connect the grey flexible drain hose supplied with the Ducted unit to the condensate pump discharge pipe of the Ducted unit Tighten the clamp securely Using 3 4 PVC connect the flexible hose to the building s condensate drain system D Using a level adjust the nuts on the threaded rods to obtain level readings both side to side and front to back on the Ducted unit 10 31 5C0C0 9

Скачать