Haier 1U35MACFRA [5/28] The maximum refrigerant charge amount m
![Haier 1U09MACFRA [5/28] The maximum refrigerant charge amount m](/views2/1812702/page5/bg5.png)
Loading and Unloading/Transporting Management/Storage Requirements
1) The products shall be carefully handled during loading and unloading.
2) Do not give impact to the indoor and outdoor units, or otherwise product damage may result.
3) Be sure to read the safety cautions before conducting any work.
4) Dry powder extinguishers or other suitable fire extinguishing apparatus .aera gnidaol eht ta deppiuqe eb dluohs
5) Untrained personnel cannot be engaged in loading and unloading of air conditioners with flammable refrigerants.
6)
Smoking and open fire are not allowed around the air conditioner.
Transporting Management Requirements
1) The maximum transporting volume of finished products shall be determined as per local regulations.
2) The vehicles used for transporting shall be operated as per local laws and regulations.
3) Dedicated after-sales vehicles shall be used for maintenance transportation, and exposed transporting of
refrigerant cylinders and the products to be maintained is not allowed.
4) A rain cover or similar shield material of the transporting vehicles should have certain flame retardancy.
5) Leakage warning device of flammable refrigerant shall be installed inside the closed-type compartment.
6) Anti-static device shall be equipped inside the compartment of transporting vehicles.
7) Dry powder extinguishers or other suitable fire extinguishing apparatus shall be equipped inside the driver 's cab.
8)
9)
The transporting vehicles shall run at a constant speed, and heavy acceleration/deceleration shall be avoided.
High-temperature area shall be avoided during transporting, and necessary radiating measures shall be taken
in case the temperature inside the compartment is too high.
Storage Requirements
1) The storage package of equipment used shall be such that no leakage of refrigerant will be caused due to
mechanical damage of the equipment inside.
2) The maximum quantity of the equipment allowed to be stored together shall be determined as per local
regulations.
Installation Instructions
WARNING!
The area of the room in which R32 refrigerant air conditioner is installed cannot be less than the minimum
area specified in the table below, to avoid potential safety problems due to out-of-limit of refrigerant
concentration inside the room caused by leakage of refrigerant from refrigeration system of the indoor unit.
Once the horn mouth of connecting lines is fastened, it may not be used again (the air tightness may be
affected).
A whole connector wire shall be used for indoor/outdoor unit as required in the operation specification of
installation process and operation instructions.
Minimum Room Area
Type
LFL
kg/m3
hv
Total Mass Charged/kg
Minimum Room Area/m
2
R32 0.306
4 7 10 15 20 30 50
0.6
0.90
1.08 1.32
1.53
1.87
2.41
1.0
1.51
1.80
2.20
2.54
3.12 4.02
1.8
2.71
3.24
3.97
4.58
5.61 7.24
2.2
3.31 3.96 4.85 5.60
6.86 8.85
m
3
The maximum refrigerant charge amount (M)
Indoor unit Outdoor unit M kg
AS26TACHRA 1U26MACFRA 0.85
AS35TBCHRA 1U35MACFRA 0.99
AS53TCCHRA 1U53RACFRA 1.4
0.68
1.14
2.05
2.50
It should be stated in the manual that an entire connection pile should be used.
It should be stated in the manual that it is recommended to place the joint of the connection pipes at the outdoor side,
if can’t be at the outdoor side, the side that cannot be reused (not detachable) must be installed at the indoor side.
When the connection pipe is reused, the horn mouth needs to be reinstalled.
Diameter of the liquid
connecting pipe (mm)
Extra gas amount per meter
after standard length (g)
∅6/∅6.35 20g
∅9/∅9.52 50g
Notes: The most gas amount should be: initial gas amount + extra gas amount <
permitted gas by safety standard.
R32 Air Conditioner Adding Extra Gas With Longer Pipe Calculator
AS71TECHRA 1U71RACFRA 1.7
Содержание
- Room air conditioner installation manual 1
- U26macfra 1u35macfra 1u53racfra 1
- U71racfra 1
- Contents 2
- Keep this manual where the user can easily find it 3
- Read the precautions in this manual carefully before operating the unit this appliance is filled with r32 3
- Warning 3
- Cautio 4
- Contains fluorinated greenhouse gases covered by the kyoto protocol 4
- How to use dred appliance 4
- Important information rega rding the refrigerant used 4
- The filled out label must be adhered in the proximity of the product charging port e g onto the inside of the stop value cover a contains fluorinated greenhouse gases covered by the kyoto protocol b factory refrigerant charge of the product see unit name plate c additional refrigerant amount charged in the field d total refrigerant charge e outdoor unit f refrigerant cylinder and manifold for charging 4
- The maximum refrigerant charge amount m 5
- Maintenance items 11
- Adhesive tape 14
- Air inlet 14
- Air outlet 14
- Compressor inside of unit 14
- Drain hose 14
- Heating insulating material 14
- Indoor outdoor unit installation drawings 14
- Non adhesive tape 14
- Optional parts for piping 14
- Piping hole cover 14
- Please be subjected to the actual product purchased 14
- Saddle l s with screws connecting electric cable for indoor and outdoor drain hose 14
- The marks from to in the gure are the parts numbers the indoor unit should be installed at the recommended height 2m 14
- When installing the unit to wall roof or rooftop fix a supporter surely with nails or wires in preparation of earthquake and strong wind 2 air conditioner mounted not above and one meter away from electric equipment such as television 14
- Hfc 410a 21
- A 110mm 22
- A 120mm 22
- A 126mm 22
- A 212mm 22
- Cushion rubber 22
- Installation dimension unit mm 22
- Caution 23
- Connection of pipes 23
- Ceramic type of ac 250v t25a 26
- Outdoor unit 27
- Australia 1300 729 948 haier com au new zealand 0800 424 372 haier co nz 28
- For haier appliances 28
Похожие устройства
- Haier 1U53RACFRA Инструкция по монтажу
- Haier 1U71RACFRA Инструкция по монтажу
- Haier AS26DCBHRA Брошюра
- Haier AS26DCBHRA Инструкция по монтажу
- Haier AS35DCBHRA Брошюра
- Haier AS35DCBHRA Инструкция по монтажу
- Haier AS53DDBHRA Брошюра
- Haier AS53DDBHRA Инструкция по монтажу
- Theben TR 610 top3 (6100130) Инструкция по эксплуатации
- Theben TR 610 top3 (6100130) Технический паспорт
- Theben TR 612 top3 (6120130) Инструкция по эксплуатации
- Theben TR 612 top3 (6120130) Технический паспорт
- Theben TR 610 top2 (6100107) Инструкция по эксплуатации
- Theben TR 610 top2 (6100107) Технический паспорт
- Theben TR 612 top2 (6120107) Инструкция по эксплуатации
- Theben TR 612 top2 (6120107) Технический паспорт
- Theben TR 611 top2 (6110107) Инструкция по эксплуатации
- Theben TR 611 top2 (6110107) Технический паспорт
- Theben TR 622 top2 (6220107) Инструкция по эксплуатации
- Theben TR 622 top2 (6220107) Технический паспорт