Haier AS53DDBHRA [11/28] Maintenance items
![Haier 1U26JABFRA [11/28] Maintenance items](/views2/1812733/page11/bgb.png)
Maintenance Items
Maintenance Requirements
Before the refrigeration system is operated, the circulating system shall be cleaned with nitrogen. Afterwards,
the outdoor unit shall be vacuumized, the duration of which cannot be less than 30 minutes. Finally, 1.5~2.0MPa
OFN shall be used for nitrogen flushing (30 seconds~1 minute), to confirm the position requiring treatment.
Maintenance of the refrigeration system is only allowed after the residual gas of flammable refrigerant is removed.
During the use of refrigerant charging tools, cross contamination of different refrigerants shall be avoided.
The total length (including the refrigerant pipelines) shall be shortened as much as possible, to reduce the residual
of refrigerant inside.
The cylinders of refrigerant shall be kept upright, and be fixed.
Before refrigerant charging, the refrigeration system shall be earthed.
The refrigerant charged shall be of the type and volume specified on the nameplate. Excessive charging is
not allowed.
After maintenance of the refrigeration system, the system shall be sealed with a safe manner.
The maintenance in progress shall not damage or lower the original class of safety protection of the system.
Maintenance of Electrical Components
Partial of the electrical component under maintenance shall be subject to inspection on refrigerant leakage
with dedicated leak detection equipment.
After the maintenance, the components with safety protection functions cannot be disassembled or removed.
During the maintenance of sealing elements, before opening the seal cover, the air conditioner shall be
powered off first. When power supply is required, continuous leak detection shall be carried out at the most
dangerous position, to avoid potential risks.
During maintenance of electrical components, the replacement of enclosures shall not affect the level of
protection.
After maintenance, it shall be guaranteed that the sealing functions will not be damaged or the sealing
materials will not lose the function of preventing the entry of flammable gas due to aging. The substitute
components shall meet the recommended requirements of the air conditioner manufacturer.
Maintenance of Intrinsically Safe Elements
The intrinsically safe element refers to the components working continuously inside flammable gas without any
risks.
Before any maintenance, leak detection and inspection on earthing reliability of the air conditioner must be
carried out, to ensure no leakage and reliable earthing.
In case the allowable voltage and current limit may be surpassed during the service of the air conditioner,
any inductance or capacitance cannot be added in the circuit.
Only the elements appointed by the air conditioner manufacturer can be used as the parts and components
replaced, or otherwise a fire may be triggered in case of refrigerant leakage.
If maintenance work does not involve system pipelines, the system pipelines shall be well protected, to ensure
that the maintenance will not cause any leakage.
After maintenance and before test run, the air conditioner must be subject to leak detection and inspection on
earthing reliability with leak detection equipment or leak detecting solution. It shall be guaranteed that the startup
inspection is carried out without leakage and under reliable earthing.
Содержание
- Room air conditioner installation manual 1
- Contents 2
- Keep this manual where the user can easily find it 3
- Read the precautions in this manual carefully before operating the unit this appliance is filled with r32 3
- Warning 3
- Cautio 4
- How to use dred appliance 4
- Important information rega rding the refrigerant used 4
- The maximum refrigerant charge amount m 5
- Maintenance items 11
- Adhesive tape 14
- Air inlet 14
- Air outlet 14
- Compressor inside of unit 14
- Drain hose 14
- Heating insulating material 14
- Indoor outdoor unit installation drawings 14
- Non adhesive tape 14
- Optional parts for piping 14
- Piping hole cover 14
- Please be subjected to the actual product purchased 14
- Saddle l s with screws connecting electric cable for indoor and outdoor drain hose 14
- The marks from to in the gure are the parts numbers the indoor unit should be installed at the recommended height 2m 14
- When installing the unit to wall roof or rooftop fix a supporter surely with nails or wires in preparation of earthquake and strong wind 2 air conditioner mounted not above and one meter away from electric equipment such as television 14
- Hfc 410a 21
- Cushion rubber 22
- Installation dimension unit mm 22
- Caution 23
- Connection of pipes 23
- Ceramic type of ac 250v t25a 26
- U53raafra 26
- Outdoor unit 27
- Australia 1300 729 948 haier com au new zealand 0800 424 372 haier co nz 28
- For haier appliances 28
Похожие устройства
- Theben TR 610 top3 (6100130) Инструкция по эксплуатации
- Theben TR 610 top3 (6100130) Технический паспорт
- Theben TR 612 top3 (6120130) Инструкция по эксплуатации
- Theben TR 612 top3 (6120130) Технический паспорт
- Theben TR 610 top2 (6100107) Инструкция по эксплуатации
- Theben TR 610 top2 (6100107) Технический паспорт
- Theben TR 612 top2 (6120107) Инструкция по эксплуатации
- Theben TR 612 top2 (6120107) Технический паспорт
- Theben TR 611 top2 (6110107) Инструкция по эксплуатации
- Theben TR 611 top2 (6110107) Технический паспорт
- Theben TR 622 top2 (6220107) Инструкция по эксплуатации
- Theben TR 622 top2 (6220107) Технический паспорт
- Theben TR 611 top2 RC 24V (6114300) Инструкция по эксплуатации
- Theben TR 611 top2 RC 24V (6114300) Технический паспорт
- Theben SELEKTA 170 top3 (1700130) Инструкция по эксплуатации
- Theben SELEKTA 170 top3 (1700130) Технический паспорт
- Theben SELEKTA 171 top3 RC (1710330) Инструкция по эксплуатации
- Theben SELEKTA 171 top3 RC (1710330) Технический паспорт
- Theben SELEKTA 172 top3 (1720130) Инструкция по эксплуатации
- Theben SELEKTA 172 top3 (1720130) Технический паспорт