Haier AC122FEAHA [8/12] Requirentents

Haier AC282FEAHA [8/12] Requirentents
1.5m~2m
Heatproof material
Slopedown degree over 1/100
Supporting frame
undulation
VP30
(About
)
10cm
Slopedown degree over 1/100
7
Fix with tape
Distribution tube
Attached heatproof pipe
Insection should be upward
Requirentents
Requirement
External diameter of copper tube (mm) Thickness of heatproof material
6.35~25.4
28.6~38.1
During refrigeration, temperatures in fluid and gas sides are low. To prevent moisture condensation,
heat insulation measures MUST be taken to the two sides.
Heat insulation of distribution tube should be done
respectively in fluid and gas side.
Note!
Heat insulation measures should be taken to indoor drainage pipe to prevent moisture condensation.
Same measures also should be taken to joint part between drainage pipe and indoor assembly.
Connection of distribution tube must adopt hard PVC agglutinant for firm adherence to guard against
water leakage.
Donít put pressure on join part of drainage pipe.
Drainage pipe is downslope (over 1/100) and no shapes like backwater etc. should be formed.
Transverse length of drainage pipe is less than 20m. If distribution tube is long, a supporting frame
should be set to prevent undulation.
Aggregative distribution tube is constructed as shown in following diagram.