8.1 Installing site
Install the unit where installation and maintenance space is enough.
Install the unit where the ceiling is horizontal and enough to bear the weight of the indoor unit.
Install the unit where the air inlet and outlet are not baffled and are the least affected by external air.
Install the unit where the supply air flow can be sent to all parts in the room.
Install the unit where it is easy to lead out the connective pipe and the drain pipe.
Install the unit where connotative heat is emitted from a heat source directly.
Caution:
Installing the equipment in any of the following places may lead to faults of the equipment (if that is inevitable,
consult the supplier):
The site contains mineral oils such as cutting lubricant.
Seaside where the air contains much salt.
Hot spring area where corrosive gases exist, e.g., sulfide gas.
Factories where the supply voltage fluctuates seriously.
Inside a car or cabin.
Place like kitchen where oil permeates.
Place where strong electromagnetic waves exist.
Place where flammable gases or materials exist.
Place where acid or alkali gases evaporate.
Other special environments.
Precautions before installation:
Decide the correct way of conveying the equipment.
Try to transport this equipment with the original package.
If the air conditioner needs to be installed on a metal part of the building, electric insulation must be
performed, and the installation must meet the relevant technical standards of electric devices.
8.2 Installing body
Confirm the dimensions of the indoor unit against the following figure.
Install Φ10 pendant bolts (4 bolts)
The intervals of the pendant bolts are shown in the following figure.
Use the Φ10 pendant bolts.
The treatment of the ceiling varies between buildings. For detailed measures, negotiate with the construction
and fit-out staff.
Scope of dismantling the ceiling. Please keep the ceiling horizontal. Reinforce the beams and girders of the
ceiling lest vibration of the ceiling.
Cut off the beams and girders of the ceiling.
Reinforce the cut-off part, beams and girders of the ceiling.
After the main body is suspended, work on the pipes and wires in the ceiling. Decide the lead-out direction of
the pipes after selecting the installation site. Especially, in a circumstance where a ceiling is available,
extend the refrigerant pipe, drain pipe, indoor/outdoor connection wires and wire controller lines to the
connection position before suspending the unit.
8.2.1 Procedure of installing the pendant bolts.
1) Base on the unit structure, please set the screw-pitch according to the size of the following figures:
Wooden structure:
Put rectangular sticks across the beams, and set pendant bolts.