Daikin FVXG-K.pdf [2/2] Preparing for the air conditioner installation

Daikin FVXG-K.pdf [2/2] Preparing for the air conditioner installation
Thermal insulation
H
Set the thermal insulation
according to the locations of the
M10 foundation bolts.
H
4. Installing the air conditioner and performing finishing.
4-1) Hook the air conditioner on the mounting plate (supplied with the air conditioner), and fix it at 2 locations on the
installation frame using screws. ( Screw (M4 × 8L))
3. Preparing for the air conditioner installation.
3-1) Remove the pipe port cover on the bottom right of the air conditioner.
3-2) Set the thermal insulation, and cover the field piping, drain hose, and inter-unit wiring with it.
(Note: The thermal insulation is used only when it is routed under the support cover.)
3-3) Fix the support cover at 8 locations on the installation frame using screws. ( Screw (M4 × 8L))
3-4) Fix the support plate (2 pcs.) at 6 locations on the installation frame using screws. ( Screw (M4 × 8L))
3-5) Fix the mounting plate (supplied with the air conditioner) at 6 locations on the installation frame using screws.
( Screw (M4 × 8L))
H
H F
NF
N
N
E
N
* In accordance with the direction of
the piping, remove the pipe port
cover of the cover on either the
left or right.
4-2) After connecting the field piping, drain hose, and
inter-unit wiring, fix the cover at 3 locations on the
installation frame using screws. ( Screw (M4 × 8L))
N
G
Screw (M4 × 8L)
(2 locations)
N
G
Cover
G
Screw (M4 × 8L)
(3 locations)
N
Diagram of finished unit
Mounting plate
(supplied with the air conditioner)
(After the support
cover is installed.)
F
Support plate
E
(After the support
cover is installed.)
F
Support plate
E
Screw (M4 × 8L)
(6 locations)
N
Screw (M4 × 8L)
(6 locations)
N
Cross-section diagram
Thermal insulation
H
Drain hose
Inter-unit wiring
Field piping
Screw (M4 × 8L)
(8 locations)
N
Support cover
F
Pipe port cover
01_EN_3P290325-1A.fm Page 2 Monday, August 22, 2011 5:32 PM
Скачать