Validating the Cable’s Shield
To use the probes SYNC LED for shield validation during
cable map tests, do the following:
1. Remove the battery door and battery from the
probe, as described under Battery Life and
Replacement on page 15.
2. Turn the probes rotary switch to CABLE MAP.
3. Replace the battery and battery door.
The SYNC LED will now indicate a good, open, or shorted
shield as described in the previous section.
To disable shield validation via the probes SYNC LED, do
the following:
1. Remove the battery door and battery from the
probe, as described under Battery Life and
Replacement on page 15.
2. Turn the probes rotary switch any position except
CABLE MAP.
3. Replace the battery and battery door.