Tohatsu MFS 25 — connecting Rod Bolts & Crank Pin Clearance: Technical Specs & Measurement [166/319]

Превью страниц Страница 166 / 319
Tohatsu MFS 25 [166/319] Power unit
5-50
Power Unit
25/30 2006
UP
3
Connecting Rod Bolts :
First Tightening Torque : 6 N·m ( 4 lb·ft ) [ 0.6 kgf·m ]
Final Tightening Torque : 12 N·m ( 9 lb·ft ) [ 1.2 kgf·m ]
6. Tighten connecting rod bolts in two steps to specified torque.
33)
Inspection of Crank Pin Oil Clearance
1. Clean connecting rod.
2. Place cylinder block upside down on the work bench. Install
piston to connecting rod 1.
3. Install crankshaft on the cylinder block.
4. Place plasti-gauge 3 on each crank pin 4 parallel to
crankshaft.
5. Install connecting rod and cap 2 to crank pin 4.
a
3
4
5
1
1
2
Do not attach piston rings.
Do not place plasti-gauge 3 on the oil hole of
crank pin 4.
Do not move connecting rod and crankshaft until
oil clearance measurement is completed.
Be sure that individual cap is installed to their
original connecting rod.
Check that "UP" mark b of connecting rod is
directed to crankshaft flywheel side.
Crank Pin Oil Clearance :
0.010 to 0.036 mm ( 0.00039 to 0.00142 in )
Functional Limit :
0.060 mm ( 0.00236 in )
7. Remove connecting rod cap and measure width of crushed
plasti-gauge on each crank pin. Replace connecting rod or
crankshaft if the width is over specified value.
mm in
b
b Plasti-gauge
MFS25_30_ch05.qxd 06.3.9 4:49 PM ページ 50

Содержание

784

Learn proper tightening torque for connecting rod bolts and how to measure crank pin oil clearance using plasti-gauge for engine maintenance and repair.