Lincat HT3/p [6/16] Installation and commissioning

Lincat HT6pFL [6/16] Installation and commissioning
IS 513 ECN 3706 Page 6 of 16
INSTALLATION AND COMMISSIONING
Site this appliance beneath an extraction canopy for the removal of combustion
products.
Installation must include sufficient ventilation to prevent the occurrence of
unacceptable concentrations of substances harmful to health in the room of
installation. There must be a minimum free area of 4.5cm
2
per kW of total heat
input.
Allow for a sufficient flow of fresh air for complete gas combustion.
Do not connect directly to any flue, ducting or mechanical extraction system.
The gas supply hose or tubing shall comply with national requirements in force and
shall be periodically examined and replaced as necessary.
An equipotential bonding terminal is provided to allow cross bonding with other
equipment.
Install this appliance on a level surface ensuring all vents are unobstructed. Any
partitions, walls or furniture must be of non-combustible material and not be closer
than 50mm
Ensure there is a space of at least 1000mm between the working surface and any
ceiling.
GAS SUPPLY AND CONNECTION
Connection is at the rear of the unit via a R
p
½" BSP)
When making the connection to the appliance an isolating cock should be fitted into the
supply line close to the unit, for emergency shutdown or servicing purposes.
SUPPLY PRESSURES
The appliances are intended to be connected directly to the gas supply without further
adjustment for those countries where the supply pressure does not exceed the pressures
as detailed above. For those countries where the supply pressures exceed the pressures
as tabled then the supply pressure must be regulated to the pressures as detailed above.
For the purposes of proving connection integrity access to the pressure test nipple is as
follows:
To gain access to the gas pressure test nipple open the oven door/s.
Remove the control knobs.
Remove the anti-tamper screws securing the fascia
Remove the oven ignitor lead.
The test nipple is found on the manifold rail.
FIRST TIME LIGHTING
The procedure for first time lighting may only be carried out by registered personnel.
To light any individual burner it may be necessary to purge all pipe work of air.
To do this, depress and hold in the full on position as many controls knobs as possible
until there is evidence of free gas flow. Upon detection of gas flow return all but one control
knobs to the 'OFF' position and light the gas at the burner corresponding to the control