18: Output A voltage calibration
Interface
Setting
Parameter 2: it always shows OP.V as output voltage.
Parameter 3: it shows the internal measurement value of the
output A voltage, and you can calibrate it by pressing Up or Down
according to the measurement from an external voltage meter.
The calibration result will be effective by pressing Enter. The
calibration range is limited within +/-9V. This function is normally
used for parallel operation.
19: Output B voltage calibration
Interface
Setting
Parameter 2: it always shows OP.V as output voltage*.
Parameter 3: it shows the internal measurement value of the
output B voltage, and you can calibrate it by pressing Up or Down
according to the measurement from an external voltage meter.
The calibration result will be effective by pressing Enter. The
calibration range is limited within +/-9V. This function is normally
used for parallel operation.
*It will display number 1 under to represent the output B
voltage.
20: Output C voltage calibration
Interface
Setting
Parameter 2: it always shows OP.V as output voltage.
Parameter 3: it shows the internal measurement value of the
output C voltage, and you can calibrate it by pressing Up or
Down according to the measurement from an external voltage
meter. The calibration result will be effective by pressing Enter.
The calibration range is limited within +/-9V. This function is
normally used for parallel operation.
*It will display number 2 under to represent the output C
voltage.
3-8. Operating Mode/Status Description
Following table shows LCD display for operating modes and status.
(1) If the UPS is in normal operation, it will show seven screens one by one, which represents 3 phase input
voltages (An, bn, Cn), 3 line input voltages (Ab, bC, CA) and frequency in turns.
(2) If parallel UPS systems are successfully set up, it will show one more screen with “PAR” in parameter 2
and assigned number in parameter 3 as below parallel screen diagram. The master UPS will be default
assigned as “001” and slave UPSs will be assigned as either “002” or “003”. The assigned numbers may be
changed dynamically in the operation;
Parallel screen
Содержание
- Table of contents p.3
- 1 transportation and storage p.4
- Safety and emc instructions p.4
- 3 installation p.4
- 2 preparation p.4
- Connection warnings p.5
- 6 standards p.6
- 5 operation p.6
- Installation and operation p.7
- 1 unpacking and inspection p.7
- 2 rear panel view p.8
- 3 single ups installation p.9
- 4 ups installation for parallel system p.11
- 5 software installation p.12
- 4 single ups operation p.15
- 3 audible alarm p.15
- 5 parallel operation p.18
- 6 abbreviation meaning in lcd display p.19
- 7 lcd setting p.20
- 8 operating mode status description p.25
- 10 warning indicator p.31
- 9 fault code p.31
- 11 warning code p.32
- Trouble shooting p.33
- Storage and maintenance p.35
- 2 maintenance p.35
- 1 storage p.35
- Specifications p.36
Похожие устройства
-
FSP Proline 3/3 30KИнструкция по эксплуатации -
FSP Proline 3/3 20KИнструкция по эксплуатации -
FSP Proline 3/3 15KИнструкция по эксплуатации -
FSP Proline 3/1 30KИнструкция по эксплуатации -
FSP Proline 3/1 20KИнструкция по эксплуатации -
FSP Proline 3/1 15KИнструкция по эксплуатации -
FSP Proline 3/1 10KИнструкция по эксплуатации -
FSP Knight PRO + RM 6KИнструкция по эксплуатации -
FSP Knight PRO + RM 10KИнструкция по эксплуатации -
FSP Knight PRO+ 1KИнструкция по эксплуатации -
FSP Knight PRO+ 2KИнструкция по эксплуатации -
FSP Knight PRO+ 3KИнструкция по эксплуатации
Узнайте, как выполнить калибровку выходного напряжения для параллельной работы устройства. Подробное руководство по настройкам и отображению статуса.