Airwell Wespak 5.05 [13/20] Electrical connections
![Airwell Wespak 5.05 [13/20] Electrical connections](/views2/1408189/page13/bgd.png)
11
English
Dual-voltage motors with
Y / ∆ connections
Skeleton
diagrams
External connection diagrams
D.O.L. starting
Y / ∆ starting
- Voltage : U
- Connection : ∆ (at lower
marked voltage)
- E.G. : 230 V / ∆
- Voltage : U √3
- Connection : Y (at lower
marked voltage)
- E.G. : 400 V / Y
8.1 - Unit connection
Before undertaking any electrical connection, make sure
that the fan motor is suitable for electrical power supply.
All wiring must be done in accordance with applicable
electrical codes and regulations.
Earthing of unit is imperative.
The manufacturer or its representative will not be held
responsible for accidents caused by incorrect or non-existing
earthing.
The units are not supplied with electrical panel.
Wiring on the electric motors must be done at site. All
motors are designed and produced in accordance with the
standards in use.
The connection of these motors will be done according to the
indications affixed on the nameplate and on the diagram
located in the terminal box.
All motors are equipped, as standard, with a normally closed
internal overload protection sensor. This safety device shall
Caution
The electric heater must never operate without the
ventilation.
8 - Electrical connections
be imperatively connected to the control circuit of the motor.
The non-respect of this instruction will cancel compulsorily
the warranty on the motor.
Power supply cables entering into the unit, must be run
through cable glands mounted on unit panel.
All orifices for cable entry done on the panels must be sealed
to prevent leakage.
8.2 - Electric heater
The factory mounted electric heater is fitted with a manual
reset high temperature cut-out switch which de-energizes
the heater in case of fan motor failure.
For electrical connection, refer to wiring diagram sticked on
the unit.
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1
L2L3
W1
V2 V1
U2
U1
Démarreur Y/
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1
L2L3
W1
V2 V1
U2
U1
Démarreur Y/
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2
L1
L2L3
W1
V2 V1
U2
U1
Y/ Starter
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2 V2
L1
L2L3
W1 V1
U2
U1
W2
L1 L2 L3
U2 V2
U1 V1 W1
W2 V2
L1
L2L3
W1 V1
U2
U1
(1) Diagrams valid for :
- 3-phase 230 ∆ / 400 Y V motors with power from 0.25 to 4.5 kW at 1500 rpm and from 0.25 to 5.5 kW at 3000 rpm,
- 3-phase 400 ∆V motors with power higher or equal to 5.5 kW at 1500 rpm, using Y / ∆ starter.
Single speed motors (1)
Содержание
- 5 5 6 5 1
- Wespak 1
- Caution 3
- English 3
- Introduction 3
- Safety precaution 3
- The manufacturer warranty will not be applied if all installation instructions stated in 3
- This manual have not been followed 3
- Warning 3
- And electronic boards may not operate correctly 4
- Change in the weather high and low temperatures should 4
- Do not stand or transport the unit on its end temporary 4
- In case of deterioration formulate the precise reserves on the transport document and send immediately a registered letter to the forwarder mentioning clearly the occured damages and a copy of the letter to the manufacturer or its representative 4
- Inspection and storage 4
- More may deteriorate certain plastic materials and cause 4
- Not damage the unit excessively high temperature 60 c or 4
- Operating limits 4
- Permanent damages in addition some electric components 4
- Physical data 4
- Snow etc 4
- Storage must be indoor completely sheltered from rain 4
- Technical features 4
- The units are shipped on pallet inspect all units for visible or concealed damages 4
- When the equipment is received all items must be carefully checked against the bill of lading to be sure all crates and cartons have been received 4
- 1 to be imperatively installed in discharge electric heater casing 2 for double skin configuration 50 mm thick panel filter cooling coil heating coil fan 5
- English 5
- Physical data cont d 5
- Technical features continued 5
- A by threaded rods only 6
- B by threaded rods and hanger rails 6
- Dimensions 6
- Fixation dimensions 6
- Bottom view 7
- Dimensions continued 7
- Duct connections 7
- English 7
- Front view 7
- Side view rear view 7
- Top view 7
- A cooling and heating configuration in the direction of air flow 8
- B heating and cooling configuration in the direction of air flow 8
- Dimensions are in mm 8
- Dimensions continued 8
- Water connections 8
- English 9
- Installation 9
- Installation location 9
- Minimum service clearances 9
- Unit handling 9
- Warning 9
- Assembly of two casings 10
- Final assembly 10
- In the other case fix the casing on the hanger rails with the aid of fixing screws see drawing below in the other case fix the casing on the hanger rails with the aid of fixing screws see drawing below 10
- Installation continued 10
- Installation instructions 10
- On the double casing units assemble the two casing with the help of factory fitted assembling clamps and screws 10
- Prepare the fixing center distances at the ceiling for each casing see section dimensions for fixing center distances 2 fix the suspension kit optional composed of threaded rods only or threaded rods and hanger rails 3 in the case that the suspension kit by threaded rods only is supplied install the casing as indicated in the drawing below 10
- Secure the unit in its final position and level it with a spirit level to assure proper drainage and operation 6 unit must be mounted in such a way that water will flow toward drain connection 10
- Suspension kit by threaded rods and hanger rails optional 10
- Suspension kit by threaded rods only optional 10
- Caution 11
- Definition of the service side 11
- English 11
- Left hand connection 11
- Left hand service side 11
- Right hand connection 11
- Right hand service side 11
- Warning 11
- Water coil connections 11
- Water connections 11
- Caution 12
- Condensate drain connection 12
- Trap for condensate evacuation 12
- Warning 12
- Water connections continued 12
- Winterizing water coils 12
- Caution 13
- Electric heater 13
- Electrical connections 13
- English 13
- Single speed motors 1 13
- Unit connection 13
- Belt alignment 14
- Belt tensioning 14
- Preliminary checks before start up 14
- Adjustable pulley adjustment 15
- Adjusting 15
- English 15
- Mounting 15
- Preliminary checks before start up continued 15
- Air filter 16
- Caution 16
- Coils removal 16
- Condensate drain pan 16
- Fan motor assembly 16
- Filter removal through the bottom 16
- Filter removal through the side 16
- Maintenance 16
- Electrical connections 17
- English 17
- Maintenance continued 17
- Step 1 17
- Step 2 17
- Step 3 17
- Step 4 17
- Water quality 17
Похожие устройства
- Airwell Wespak 5.05 Руководство по обслуживанию
- Airwell Wespak 6.05 Инструкция по эксплуатации
- Airwell Wespak 6.05 Руководство по обслуживанию
- LG GA-B449YVQZ Инструкция по эксплуатации
- LG GA-B419SQJL Инструкция по эксплуатации
- LG GA-B419SLJL Инструкция по эксплуатации
- Samsung 350V5C-A01 Инструкция по эксплуатации
- Sony 55-200MM, F4-56 Инструкция по эксплуатации
- Sony 50MM F1.8 Инструкция по эксплуатации
- Sony 18-250MM, F35-63 Инструкция по эксплуатации
- Sony BC-TRP Инструкция по эксплуатации
- Sony NWZ-B172L 2Gb blue Инструкция по эксплуатации
- Sony Walkman NWZ-E474 8 Gb Red Инструкция по эксплуатации
- Sony Walkman NWZ-E573 4Gb Black Инструкция по эксплуатации
- Sony Walkman NWZ-E573 4Gb White Инструкция по эксплуатации
- Sony Walkman NWZ-W273B Black Инструкция по эксплуатации
- Sony Xperia E C1505 Pink Инструкция по эксплуатации
- Sony Xperia Z1 Purple Инструкция по эксплуатации
- Acer B226HQLAymdr Инструкция по эксплуатации
- Acer B236HLymdpr Инструкция по эксплуатации