Galletti LCE 091 HS [21/64] Start up

Galletti LCE 052 HS [21/64] Start up
LCE
RG66004766_rev.05
21
7 START-UP
7.1 PRELIMINARY CHECKS
- Check that all the valves in the cooling circuit are open (liquid line).
- Check that the electrical connections have been made properly and that all the terminals are
securely tightened. This check should also be included in a periodic six-month inspection.
- Check that the voltage at the RST terminals is 400 V ± 5% and make sure the yellow indicator light
of the phase sequence relay is on. The phase sequence relay is positioned in the middle right part of
the electric control board; if the sequence is not duly observed, it will not enable the machine to start.
- Make sure there are no refrigerant leaks that may have been caused by accidental impacts during
transport and/or installation.
- Check the power supply of the crankcase heating elements, where present.
The heating elements must be turned on at least 12-10 minutes before the unit is
started. This function is carried out automatically when the main switch is off. Their
function is to raise the T of the oil in the sump and limit the quantity of refrigerant
dissolved in it.
To verify whether the heating elements are working properly, check the lower part of the compressors:
it should be warm or in any case at a temperature of 10 -15°C higher than the ambient temperature.
Pressure
within the
crankcase
% of R410A dissolved in oil
Oil T