Daikin BEVQ100MVE [5/10] Dimensional drawing centre of gravity

Daikin BEVQ100MVE [5/10] Dimensional drawing centre of gravity
Indoor Units • JUNCTION BOX • BEVQ-MVE
1
2
VRVII Systems • Indoor Units
3
2 Dimensional drawing & centre of gravity
2 - 1 Dimensional drawing
2 - 1 - 1 Ceiling suspended installation
BEVQ-
MVE
3D045390
(Suspension bolt pitch)
(Suspension bolt pitch)
(165.5)
(Servicing space) (Servicing space)
100 or more
Inspection hatch
(Servicing space)
200 or more
(Servicing space)
200 or more
Note 2
Note 3
INSTALLATION FIGURE
(When hanging the unit from the ceiling)
NOTES
1 Be sure to install wire connection port to be sure to become
downward.
2 Be sure to secure the space which can be the thightening work of
the flare nut.
3 Be sure to secure the space of 400 mm or more when you cannot
install the inspection hatch right under the unit.
Nr Part name Description
1 Liquid pipe connection port ø 9.5 mm Flare connection
2 Gas pipe connection port ø 15.9 mm Flare connection
3 Electric parts box
4 Suspension bolt
5 Wire connection port (Indoor unit conncection)
6 Wire connection port (Power supply • Ground)
7 Wire connection port (Transmission (VRV) • Gas pipe thermistor)
Скачать