Daikin RXYQ192MTJU [51/273] Special control

Daikin RXYQ192MTJU [51/273] Special control
Special Control SiUS39-601
40 Function
3. Special Control
3.1 Startup Control
3.1.1 Startup Control in Cooling Operation
3.1.2 Startup Control in Heating Operation
Actuator Operation Remarks
Compressor Differential pressure control
Compressor operating frequency
increases by 1 step / 20 sec until
Pc - Pe>58 psi
Outdoor unit fan High pressure control
Initial compressor operating frequency is
set to STEP 1.
1-step increase with Pc>319 psi
1-step decrease with Pc<261 psi
Four way valve OFF
Main motorized valve (EV1) 0 pls
Subcooling motorized valve (EV2) 0 pls
Hot gas bypass valve (SVP) ON
Oil equalization valve (SVO) ON
Receiver gas charging valve (SVL) OFF
Receiver gas discharging valve (SVG) OFF
Non-operating unit gas discharging
valve (SVSG)
OFF
Non-operating unit liquid pipe stop valve
(SVSL)
ON
Ending conditions
200 sec.
Pc - Pe>58 psi
or
Actuator Operation Remarks
Compressor Differential pressure control
Compressor operating frequency
increases by 1 step / 20 sec until
Pc - Pe>58 psi
Outdoor unit fan STEP9
Four way valve ON
Main motorized valve (EV1) 200 pls
Subcooling motorized valve (EV2) 0 pls
Hot gas bypass valve (SVP) ON
Oil equalization valve (SVO) ON
Receiver gas charging valve (SVL) OFF
Receiver gas discharging valve (SVG) OFF
Non-operating unit gas discharging
valve (SVSG)
OFF
Non-operating unit liquid pipe stop valve
(SVSL)
ON
Ending conditions
200 sec.
Pc - Pe>58 psi
or

Содержание

Скачать