Daikin RXYQ46PAY6 [19/33] Clarendon towers

Daikin RXYQ48PAY6 [19/33] Clarendon towers
34 35
Clarendon Towers
Christchurch, New Zealand
8
PROJECT OUTLINE
Others
BS Unit × 58
intelligent Touch Controller
RWEYQ10 × 7 FXMQ-PVE × 61
Outside unit Indoor unit
EQUIPMENT
Christchurch, New Zealand
Office
17F
2010 Retrofit
Location
Application
Number of floors
Project year
OFFICE
PROJECT COMMENTARY
Water-cooled VRV system was chosen instead of Air-cooled VRV due to limited space for condensers around the building.
Condensers are installed in each floor. Existing hydronic circuit, pumps cooling towers were used for the project.
System has demand cards per condenser set (6 in total). intelligent Touch Controller can control majority of system with BMS link to control
water pumps / towers plus Di cards.
Daikin was chosen because of high level of service during the initial design process.
DESIGN DRAWING
Fig-1 Floor Plan

Содержание