SilverStone ST75ZF [12/16] St75zf manual 12

SilverStone ST75ZF [12/16] St75zf manual 12
11
6.3 Production Line Testing
100% of the power supply production must have the following test performed. Each power
shall be marked indicating the testing was done and passed. Typically this is done by stamping
or labeling the power supply with "Hi-pot test OK".
6.4 Hi-Pot Testing
Each power supply must be Hi-pot tested according UL and TUV requirements, Minimum
typical testing voltage for Hi-pot testing are 1500Vac or 2121Vdc. However depending on the
power supply design the testing voltage May be higher. If higher the power supplies shell be
at the higher value.
6.5 Ground Continuity Testing
UL and TUV require that each power supply ground is tested, to ensure there is continuity
between the ground inlet of the power supply and the power supply chassis. This can be
performed with an ohm meter, or an electronic circuit that lights up and illustrates the ground
has continuity.
Based on EN50116, ERG or TUV require that each power supply ground id tested with a
25Amp ground test.
7. Reliability
7.1 Mean Time Between failures (MTBF)
The MTBF of the power supply shall be calculated utilizing the Part-Stress Analysis method
of MIL217F or Bellcore RPP. The calculated MTBF of the power supply shall be greater than
100,000 hours under the following conditions:
Full rated load
120V AC input
Ground Benign
25
Technical information in this specification is subject to change without notice.
The revision of specification will be marked on the cover.
8. Connections
  8.1 AC Input Connector and DC Wire Harness and Connector Requirements
  Please refer to the attachment
9. Physical Characteristics Size
 9.1 Power Supply Dimension: 150.0mm(W) x 86.0mm(H) x 180.0mm(D)

Похожие устройства