10 | Maintenance and service
Installer and user reference guide
30
FXSN50~112A2VEB
CO₂ Conveni-Pack: indoor unit
4P602817-1A – 2020.05
rear suction bottom suction
5 Confirm that 4 hangers are fixed.
6 In case of bottom suction, close the air inlet grille.
7 Turn ON the power.
8 To remove warning screens, see the reference guide of the user interface.
10.3 Maintenance before a long stop period
E.g., at the end of the season.
Let the indoor units run in fan only operation for about half a day in order to dry
the interior of the units.
Turn off the power. The user interface display disappears. When the main power
is turned on, the air conditioner will use some power, even if it is not operating.
Clean the air filter and the casing of the indoor unit (see "10.2Cleaning the air
filter and air outlet" [4 29]). Make sure to install cleaned air filters back in the
same position.
Remove the batteries from the user interface (if applicable).
10.4 Maintenance after a long stop period
E.g., at the beginning of the season.
Check and remove everything that might be blocking inlet and outlet vents of
indoor units and outdoor units.
Check if the earth is connected properly.
Check if there is somewhere a broken wire. Contact your dealer in case of
problems.
Clean the air filter and the casing of the indoor unit (see "10.2Cleaning the air
filter and air outlet" [4 29]). Make sure to install cleaned air filters back in the
same position.
Turn on the power at least 6 hours before operating the unit in order to ensure
smoother operation. As soon as the power is turned on, the user interface
display appears.
Insert batteries in the user interface (if applicable).
10.5 About the refrigerant
This product contains refrigerant gases.