Daikin EHSX16P50BA [21/84] Remove cover hood and heat insulation

Daikin EHSX16P50BA [21/84] Remove cover hood and heat insulation
4 x Set-up and installation
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1441399_02 – 01/2021 – EN
Installation and operating instructions
21
Install the Daikin Altherma EHS(X/H) at the installation site.
Recommended clearances (fig. 4-5):
To the wall: (s1) 100 mm, (s2) 500 mm.
From the ceiling (X): 1200 mm, minimum 480 mm.
Carefully transport the Daikin Altherma EHS(X/H), use the
handles.
When setting up the unit in a cabinet, behind panels or in
other restricted conditions, sufficient ventilation
(e.g., using ventilation gratings) must be ensured.
If necessary, install the optional Backup-Heater (EKBUxx)
into the Daikin Altherma EHS(X/H) (fig. 4-5).
Observe the assembly and operating manual supplied with
the accessory (
for tightening torque see chapter 10.3).
Fig. 4-5 Layout (shown on Daikin Altherma EHS(X/H) P50B with incor-
poration of the optional Backup-Heater)
4.3 Remove cover hood and heat insulation
Lift the cover hood at the back and remove to the front.
Fig. 4-6 Removing the protective cover
A
Fig. 4-7 Daikin Altherma EHS(X/H) without cover hood
CAUTION!
The thermal insulation (fig. 4-7, item A)
consists of pressure sensitive shaped
EPP components that can easily be
damaged by inappropriate handling.
Carry out removal of the thermal
insulation only in the sequence and in
the directions quoted below.
Do not use force.
Do not use tools.

Содержание

Скачать