Daikin EHSH16P50BA — установка и наладка интегрированных солнечных систем отопления [41/84]

Daikin EHSH08P50BB [41/84] X set up and installation
4 x Set-up and installation
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1441399_02 – 01/2021 – EN
Installation and operating instructions
41
4.8.2 Filling the hot water heat exchanger
Open the shutoff valve for the cold water supply pipe.
Open the hot water tap connections so that the draw-off
volume can be set as high as possible.
Once water has been discharged from the tap connections,
do not interrupt the cold water flow; this will ensure that the
heat exchanger will be fully vented and that any impurities or
residue will be discharged.
4.8.3 Filling the storage tank
See chapter 7.3.
4.8.4 Filling the heating system
See chapter 7.4.

Содержание

Подробные инструкции по установке и наладке интегрированных солнечных систем отопления. Узнайте, как правильно заполнить теплообменник и накопительный бак.

Скачать