List of contents
1 General safety precautions 3
1.1 Particular safety instructions ..................................................... 3
1.1.1 Observing the instructions .......................................... 3
1.1.2 Meaning of warnings and symbols.............................. 4
1.2 Safety instructions for installation and operation....................... 4
1.2.1 General ....................................................................... 4
1.2.2 Intended use ............................................................... 5
1.2.3 Installation room.......................................................... 5
1.2.4 Electrical installation ................................................... 6
1.2.5 Requirements for heating and storage water.............. 6
1.2.6 Heating system and sanitary connection .................... 6
1.2.7 Operation .................................................................... 6
1.3 Maintenance, troubleshooting and decommissioning ............... 6
1.4 Warranty conditions................................................................... 7
2 Product description 7
2.1 Design and components............................................................ 7
2.2 Function of the 3‑way changeover valves ................................. 10
3 Set-up and installation 10
3.1 Dimensions and connection dimensions ................................... 11
3.2 Transport and delivery............................................................... 12
3.3 Installing the heat pump ............................................................ 12
3.3.1 Selecting the installation site....................................... 12
3.3.2 Installing the device .................................................... 12
3.4 Preparing the device for installation .......................................... 13
3.4.1 Remove the front screen............................................. 13
3.4.2 Remove the protective cover ...................................... 13
3.4.3 Moving the switch box to the service position............. 14
3.4.4 Open the switch box ................................................... 14
3.4.5 Removing the bottom thermal insulation..................... 14
3.4.6 Opening the air purge valve........................................ 15
3.4.7 Aligning the connections of the heating inflow and
return flow ................................................................... 15
3.4.8 Making the hood opening............................................ 16
3.4.9 Installing the rotary switch of the controller................. 17
3.4.10 Securing the hood....................................................... 17
3.5 Installing optional accessories................................................... 17
3.5.1 Installation of electric backup heater (EKBUxx).......... 17
3.5.2 Installation of the external heat generator connection
set (EKBUHSWB) ....................................................... 17
3.5.3 Installation of the DB connection kit............................ 18
3.5.4 Installation of the P connection kit .............................. 18
3.6 Water connection ...................................................................... 18
3.6.1 Minimum water volume ............................................... 19
3.6.2 Connecting hydraulic lines .......................................... 19
3.6.3 Connecting the drain................................................... 20
3.7 Electrical connection ................................................................. 20
3.7.1 Overall connection diagram ........................................ 21
3.7.2 Position of the PCBs and terminal strips..................... 22
3.7.3 Mains connection ........................................................ 22
3.7.4 General information on the electrical connection........ 22
3.7.5 Connecting the heat pump outdoor unit...................... 22
3.7.6 Connecting the outdoor temperature sensor
(optional) ..................................................................... 23
3.7.7 External switching contact .......................................... 23
3.7.8 EBA (external requirement request) ........................... 23
3.7.9 Connecting an external heat generator....................... 24
3.7.10 Connecting the room thermostat................................. 24
3.7.11 Connection of optional RoCon system components ... 25
3.7.12 Connecting the HP convector ..................................... 25
3.7.13 Connecting switching contacts (AUX outputs) ............ 26
3.7.14 Low rate mains connection (HT/NT) ........................... 26
3.7.15 Connecting an intelligent controller (Smart Grid - SG) 27
3.8 Connection for refrigerant........................................................... 27
3.8.1 Laying refrigerant piping .............................................. 27
3.8.2 Pressure test and filling the refrigerant circuit.............. 27
3.9 Filling the system........................................................................ 28
3.9.1 Checking the water quality and adjusting the
manometer................................................................... 28
3.9.2 Filling hot water heat exchangers ................................ 28
3.9.3 Filling the storage tank................................................. 28
3.9.4 Filling the heating system ............................................ 28
4 Configuration 29
5 Check list for start-up 30
5.1 Requirements ............................................................................. 30
5.2 Commissioning at low ambient temperatures ............................ 30
5.3 Bleeding the hydraulic system.................................................... 30
5.4 Checking the minimum flow ....................................................... 31
5.5 Start screed drying (only if required) .......................................... 31
5.6 Commissioning checklist ............................................................ 31
5.7 Handover to the operating company .......................................... 32
6 Technical data 33
6.1 Information on the type plate...................................................... 33
6.2 Characteristic lines ..................................................................... 33
6.2.1 Sensor characteristic lines ........................................... 33
6.2.2 Characteristic curves for pumps .................................. 34
6.3 Tightening torques...................................................................... 34
6.4 Minimum floor area and ventilation openings............................. 34
6.5 Electrical connection diagram .................................................... 36
6.6 Piping diagram for refrigerant circuit .......................................... 38
Содержание
- Installation and operating manual p.1
- Daikin altherma 3 r ech ₂ o p.1
- Configuration 29 p.2
- Check list for start up 30 p.2
- Technical data 33 p.2
- Set up and installation 10 p.2
- Product description 7 p.2
- List of contents p.2
- Installation and operating manual p.2
- General safety precautions 3 p.2
- Particular safety instructions p.3
- Observing the instructions p.3
- General safety precautions p.3
- Safety instructions for installation and operation p.4
- Meaning of warnings and symbols p.4
- General safety precautions p.4
- General p.4
- Devices that have not been set up and installed correctly can impair the function of the device and or cause serious or fatal injury to the user p.4
- Before starting any work on the indoor unit and secure against being switched on inadvertently p.4
- Work on the indoor unit such as set p.4
- Warning p.4
- Up servicing connection and initial commissioning must only be carried out by persons who are authorised and who have successfully completed qualifying technical or vocational training and who have taken part in advanced training sessions recognised by the relevant responsible authorities for the specific activity these include in particular certified heating engineers qualified electricians and hvac specialists who because of their professional training and expert knowledge have experience in the professional installation and maintenance of heating cooling and air conditioning systems as well as hot water storage tanks p.4
- Switch off the external main switch p.4
- Make sure that the supply company p.5
- Load carrying capacity of the ground of 1050 kg p.5
- Intended use p.5
- Installation room p.5
- Warning p.5
- General safety precautions p.5
- The storage tank may not be p.5
- Exposed to continuous direct sunlight as the uv radiation and the effects of the weather will damage the plastic p.5
- The indoor unit must be installed p.5
- Environment is not permissible p.5
- The electronic control system must p.5
- Does not provide corrosive domestic water suitable water treatment may be required p.5
- Set up in an explosion risk p.5
- Do not leave any tools or other p.5
- Protected from frost p.5
- Caution p.5
- Plus safety margin is ensured the ground must be flat horizontal and level p.5
- C e g electrical heater oil heater chimney and combustible materials p.5
- Outdoor set up is not permissible p.5
- C and in the extreme case can catch fire p.5
- Only install the indoor unit if sufficient p.5
- Only install the indoor unit at a p.5
- Objects below the hood of the device after finishing installation or maintenance work p.5
- Not be exposed to weather effects such as rain and snow under any circumstances p.5
- Heating system and sanitary connection p.6
- General safety precautions p.6
- Electrical installation p.6
- Caution p.6
- The indoor unit must not be operated p.6
- System is connected install the indoor unit far enough under the solar panels to allow complete emptying of the solar heating system follow the instructions in the drainback solar heating system manual an insufficient height difference may lead to destruction of the drainback solar heating system p.6
- Requirements for heating and storage water p.6
- Operation p.6
- Maintenance troubleshooting and decommissioning p.6
- In rooms with ambient temperatures of more than 40 c p.6
- If a drainback solar heating p.6
- Warranty conditions p.7
- Product description p.7
- Design and components p.7
- Upper side of the device p.8
- Structure 4p30d 8p30d biv p.8
- Product description p.8
- Internal structure 04p30d 08p30d p.8
- 3 design 2 3 design and components internal p.8
- 2 2 design and components top of the device p.8
- Structure 4p50d 8p50d biv p.9
- Product description p.9
- Internal structure 04p50d 08p50d p.9
- 4 design 2 4 design and components internal p.9
- Work on the indoor unit such as set up repair p.10
- Warning p.10
- Set up and installation p.10
- Incorrect set up and installation would render the manufacturer s guarantee for the unit void if you have questions please contact our technical customer service p.10
- Function of the 3 way changeover valves p.10
- Cooling systems heating pumps climate control systems and heating devices that have been set up and installed incorrectly can both endanger human life and health and be impaired in their function p.10
- Connection and initial commissioning for example must only be carried out by persons who are authorised who have successfully completed qualifying technical or vocational training for the respective activity and who have taken part in advanced training sessions recognised by the relevant responsible authority these include in particular certified heating engineers qualified electricians and hvac specialists who because of their professional training and expert knowledge have experience in the professional installation and maintenance of heating cooling and air conditioning systems and heat pumps p.10
- 2 5 function of 3 way changeover valve p.10
- Dimensions 04p50d 08p50d p.11
- Dimensions 04p30d 08p30d p.11
- 3 2 dimensions 04p50d 08p50d p.11
- 3 1 dimensions 04p30d 08p30d p.11
- Set up and installation p.11
- Dimensions and connection dimensions p.11
- Transport and delivery p.12
- Set up and installation p.12
- Selecting the installation site p.12
- Installing the heat pump p.12
- Installing the device p.12
- Set up and installation p.13
- Remove the protective cover p.13
- Remove the front screen p.13
- Preparing the device for installation p.13
- Set up and installation p.14
- Removing the bottom thermal insulation p.14
- Open the switch box p.14
- Moving the switch box to the service position p.14
- Aligning the connections of the heating inflow and return flow p.15
- Set up and installation p.15
- Opening the air purge valve p.15
- Set up and installation p.16
- Making the hood opening p.16
- Set up and installation p.17
- Securing the hood p.17
- Installing the rotary switch of the controller p.17
- Installing optional accessories p.17
- Installation of the external heat generator connection set ekbuhswb p.17
- Installation of electric backup heater ekbuxx p.17
- Water connection p.18
- Set up and installation p.18
- Installation of the p connection kit p.18
- Installation of the db connection kit p.18
- Minimum water volume p.19
- Connecting hydraulic lines p.19
- Set up and installation p.19
- Set up and installation p.20
- Electrical connection p.20
- Connecting the drain p.20
- Set up and installation p.21
- See 6 electrical connection diagram 4 36 p.21
- Overall connection diagram p.21
- 3 31 overall connection diagram for the electrical connection during the device installation for the legend and pin assignment of the pcb p.21
- Set up and installation p.22
- Position of the pcbs and terminal strips p.22
- Mains connection p.22
- General information on the electrical connection p.22
- Connecting the heat pump outdoor unit p.22
- External switching contact p.23
- Eba external requirement request p.23
- Connecting the outdoor temperature sensor optional p.23
- Set up and installation p.23
- Set up and installation p.24
- Connecting the room thermostat p.24
- Connecting an external heat generator p.24
- Set up and installation p.25
- Connection of optional rocon system components p.25
- Connecting the hp convector p.25
- Set up and installation p.26
- Low rate mains connection ht nt p.26
- Connecting switching contacts aux outputs p.26
- Set up and installation p.27
- Pressure test and filling the refrigerant circuit p.27
- Laying refrigerant piping p.27
- Connection for refrigerant p.27
- Connecting an intelligent controller smart grid sg p.27
- Checking the water quality and adjusting the manometer p.28
- Set up and installation p.28
- Filling the system p.28
- Filling the storage tank p.28
- Filling the heating system p.28
- Filling hot water heat exchangers p.28
- Configuration p.29
- Requirements p.30
- Commissioning at low ambient temperatures p.30
- Check list for start up p.30
- Bleeding the hydraulic system p.30
- Start screed drying only if required p.31
- Commissioning checklist p.31
- Checking the minimum flow p.31
- Check list for start up p.31
- Handover to the operating company p.32
- Check list for start up p.32
- Technical data p.33
- Sensor resistance in kohm according to standard or manufacturer s indications p.33
- Sensor characteristic lines p.33
- Part of the current technical data is available on the regional daikin website publicly accessible the complete technical data is available via the daikin business portal authentication required p.33
- Ntc 98 6 56 5 33 1 20 4 12 1 8 0 5 2 3 6 2 3 1 8 1 8 0 3 0 9 0 2 0 6 p.33
- Ntc 65 1 39 25 16 9 10 2 7 76 4 6 3 97 2 12 1 38 1 69 p.33
- Measured temperature in c p.33
- Information on the type plate p.33
- Characteristic lines p.33
- 6 3 characteristic of temperature sensor p.33
- 6 2 characteristic of temperature sensor p.33
- 6 1 type plate p.33
- 6 1 temperature sensor p.33
- 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 p.33
- Minimum floor area and ventilation openings p.34
- Characteristic curves for pumps p.34
- Tightening torques p.34
- Technical data p.34
- Technical data p.35
- Technical data p.36
- Electrical connection diagram p.36
- 6 6 electrical connection diagram p.36
- Technical data p.37
- Technical data p.38
- Piping diagram for refrigerant circuit p.38
- 6 7 components in the heat pump circuit p.38
Похожие устройства
-
Daikin EVLQ08CAV3Руководство по применению для установщика -
Daikin EVLQ08CAV3Справочное руководство для монтажника -
Daikin EVLQ08CAV3Общие правила техники безопасности -
Daikin EVLQ08CAV3Инструкция по монтажу -
Daikin EVLQ05CAV3Справочное руководство для монтажника -
Daikin EVLQ05CAV3Руководство по применению для установщика -
Daikin EVLQ05CAV3Общие правила техники безопасности -
Daikin EVLQ05CAV3Инструкция по монтажу -
Daikin EHYKOMB33AA3Справочное руководство для монтажника -
Daikin EHYKOMB33AA3Руководство по применению для установщика -
Daikin EHYKOMB33AA3Руководство по эксплуатации -
Daikin EHYKOMB33AA2Руководство по применению для установщика
Подробное руководство по установке и эксплуатации тепловых насосов. Узнайте о безопасности, настройках и обслуживании для эффективной работы устройства.