Daikin ADEQ100A7VEB [11/12] Test operation

Daikin ADEQ71A7VEB [11/12] Test operation
ADEQ71~125A7VEB
Split System air conditioners
4P335705-1 – 2012.11
Installation manual
8
TEST OPERATION
Refer to the section of "For the following items, take special care
during construction and check after installation is finished" on page 2.
After finishing the construction of refrigerant piping, drain piping,
and electric wiring, conduct test operation accordingly to protect
the unit.
1 Open the gas side stop valve.
2 Open the liquid side stop valve.
3 To protect the unit, turn on the main power switch 6 hours before
operating.
4 Set to cooling operation with the remote controller and start
operation by pushing ON/OFF button.
5 Press Inspection/Test Operation button 4 times and operate at
Test Operation mode for 3 minutes.
6 Press Inspection/Test Operation button and operate normally.
7 Confirm function of unit according to the operation manual.
WIRING DIAGRAM
A1P......................PRINTED CIRCUIT BOARD
A2P......................PRINTED CIRCUIT BOARD (FAN)
A3P......................PRINTED CIRCUIT BOARD (CAPACITOR)
C1,C2,C3.............CAPACITOR
F1U,F2U ..............FUSE (T, 5 A, 250 V)
F3U,F4U ..............FUSE (T, 6.3 A, 250 V)
HAP .....................LIGHT EMITTING DIODE
(SERVICE MONITOR - GREEN)
KPR,K1R .............MAGNETIC RELAY
L1R ......................REACTOR
M1F .....................MOTOR (FAN)
M1P .....................MOTOR (DRAIN PUMP)
PS........................SWITCHING POWER SUPPLY
Q1DI ....................EARTH LEAK DETECTOR
RC .......................SIGNAL RECEIVER CIRCUIT
R1 ........................RESISTOR (CURRENT LIMITING)
R2 ........................CURRENT SENSING DEVICE
R3,R4 ..................RESISTOR (ELECTRIC DISCHARGE)
R1T......................THERMISTOR (SUCTION AIR)
R2T......................THERMISTOR (LIQUID)
R3T ..................... THERMISTOR (GAS)
R5T ..................... THERMISTOR NTC (CURRENT LIMITING)
SS1 ..................... SELECTOR SWITCH (EMERGENCY)
S1L...................... FLOAT SWITCH
TC ....................... SIGNAL TRANSMISSION CIRCUIT
V1R ..................... DIODE BRIDGE
V2R ..................... POWER MODULE
X1M..................... TERMINAL STRIP (POWER SUPPLY)
X2M..................... TERMINAL STRIP (CONTROL)
Z1C ..................... NOISE FILTER (FERRITE CORE)
Z1F...................... NOISE FILTER
CONNECTOR OPTIONAL ACCESSORY
X28A ................... CONNECTOR (POWER SUPPLY FOR WIRING)
X33A ................... CONNECTOR (FOR WIRING)
X35A ................... CONNECTOR (ADAPTOR)
WIRED REMOTE CONTROLLER
R1T ..................... THERMISTOR (AIR)
SS1 ..................... SELECTOR SWITCH (MAIN/SUB)
NOTE
If the main power supply is turned off during operation,
operation will restart automatically after the power
turns back on again.
: FIELD WIRING BLK : BLACK ORG : ORANGE
: CONNECTOR BLU : BLUE PNK : PINK
: WIRE CLAMP BRN : BROWN RED : RED
: PROTECTIVE EARTH (SCREW)
GRN : GREEN WHT : WHITE
L: LIVE GRY : GREY YLW : YELLOW
N: NEUTRAL
WIRED REMOTE CONTROLLER :
(OPTIONAL ACCESSORY) :
SWITCH BOX (INDOOR) :
TRANSMISSION WIRING :
CENTRAL REMOTE CONTROLLER :
INPUT FROM OUTSIDE :
COMMON POWER SUPPLY :
NOTE
1. USE COPPER CONDUCTORS ONLY.
2. WHEN USING THE CENTRAL REMOTE CONTROLLER, SEE MANUAL FOR CONNECTION TO THE UNIT.
3. WHEN CONNECTING THE INPUT WIRES FROM OUTSIDE, FORCED "OFF" OR "ON/OFF" CONTROL OPERATION CAN
BE SELECTED BY THE REMOTE CONTROLLER. SEE INSTALLATION MANUAL FOR MORE DETAILS.
4. REFER TO INSTALLATION MANUAL.