Daikin CHYHBH05AFV32 [11/32] Installation

Daikin CHYHBH05AFV32 [11/32] Installation
4 Installation
Installation manual
11
CHYHBH05+08AF
Daikin Altherma R Hybrid
4P471756-1F – 2020.10
# Action
5 Reinstall the faceplate onto the wallplate.
Be careful NOT to pinch the wiring when attaching the
frontplate to the unit.
(a) The main user interface is required for operation, but has to
be ordered separately (mandatory option).
4A From the rear
b
a
PCB
4B From the left
a
PCB
b
4C From the top
a
b
PCB
b
4D From the top centre
a
PCB
b
b
a Notch this part for the wiring to pass through with nippers
etc.
b Secure the wiring to the front part of the casing using the
wiring retainer and clamp.
4.5.4 To connect the shut-off valve
1 Connect the valve control cable to the appropriate terminals as
shown in the illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a
NO (normally open) valve.
X2M
X1M
7
5
6
X5M
X2M
X1M
X5M
NO
NC
M2S M2S
7
6
5
2 Fix the cable with cable ties to the cable tie mountings.
4.5.5 To connect the domestic hot water pump
1 Connect the domestic hot water pump cable to the appropriate
terminals as shown in the illustration below.
35
34
X2M
X1M
X5M
1~
M
M2P
2 Fix the cable with cable ties to the cable tie mountings.
4.5.6 To connect the alarm output
1 Connect the alarm output cable to the appropriate terminals as
shown in the illustration below.

Содержание

Похожие устройства

Скачать