Daikin UATYQ65ABAY1 [23/44] Installation

Daikin UATYQ20ABAY1 [23/44] Installation
Translation from original instructions
Installation manual
23
We reserve the right to make changes without any prior notice.
UATYQ*Y1
Packaged Rooftop
4P522680-1
5.3 Installation
The units are sent from the factory already tested and they need only the electrical, aeraulic and hydraulic connections
for installation.
The only unassembled component shipped is the rain guard for units that envisage air exchange and are therefore
equippedwithexternalairdamper.
5.3.1 Fitting of rain hoods
Arainguardcanbettedontheopeningforthepassageofexternalair.
Protectionisachievedwithhoods;thenumberofelementsformingtheguarddependsonthesizeoftheairpassage.
Theguardissuppliedinaseparatekitforttingbytheinstaller.
Inadditiontothehoods,thekitincludesaprotectivemeshandself-drillingscrewsforxing.
Fig. 6 Rain guard
Theprotectivemeshistobexedbetweentheguardandtheframeoftheunitandcovertheentireopening.
Usea6mmscrewdriverwithsockettoxit.
Totcorrectly:
- Restthemeshlteragainsttheedgeoftheexternalairopening;
- beginttingfromtheupperpartoftheopening;
- using the holes on each element of the guard, secure them to the frame of the unit with the self-drilling screws
provided.
- repeat this operation for all the elements of the guard.

Содержание

Скачать