Daikin EKSRPS4AB [5/44] X safety

Daikin EKSRPS4AB [5/44] X safety
2 x Safety
Daikin EKSRPS4
Daikin Control and pump unit for solar systems
008.1624644 – 08/2015
Operating and installation instructions
5
Switch off the main switch and secure it against unintended
switching on when carrying out any work on the heating
system.
Electrical installation
Electrical installation must be carried out only by qualified
electrical experts and in compliance with the valid electro-
technical guidelines as well as the regulations of the relevant
energy supply company (EVU).
For the mains connection, use a separate EN 60335-1
disconnector for all-pole disconnection from the power mains
and a GFCI circuit breaker with a reaction time 0.2 s.
Before completing the mains connection, compare the mains
voltage, indicated on the type plate (230 V, 50 Hz) with the
supply voltage.
Before beginning work on live parts, disconnect them from the
power supply (switch off main switch, remove fuse) and
secure against unintentional restart.
Equipment covers and service panels must be replaced as
soon as the work is completed.
Instructing the user/owner
Before you hand over the heating system, explain to the
user/owner how to operate and check the heating system.
Make a record of the handover by filling out and signing the
installation and instruction forms jointly with the user/owner.

Содержание

Похожие устройства

Скачать