Outdoor unit
6.Purging Method:To use vacuum pump
Detach the service port's cap of 3-way valve, the
valve rod's cap for 2-way valve and 3-way's, connect
the service port into the projection of charge hose
(Iow) for gaugemanifold. Then connect the projection
of charge hose (center) for gaugemanifold into
vacuum pump.
3-way valve
Gas Side
2-way valve
2-way valve
Service port cap
Gaugemanifold(for R410A)
Vacuum pump(for R410A)
Open
Close
Liquid Side
Open the handle at Iow in gaugemanifold, operate
vacuum pump. If the scale-moves of gause (Iow)
reach vacuum condition in a moment, check again.
Vacuumize for over 15min. And check the level gauge
which should read -0.1 MPa (-76 cm Hg) at Iow
pressure side. After the completion of vacuumizing,
close the handle 'Lo' in gaugemanifold and stop the
operation of the vacuum pump.
Check the condition of the scale and hold it for 1-2min.
If the scale-moves back in spite of tightening, make
flaring work again, the return to the beginning of .
Open the valve rod for the 2-way valve to an angle of
anticlockwise 90 degrees.
After 6 seconds, close the 2-way valve and make
the inspection of gas leakage.
No gas leakage?
In case of gas leakage, tighten
parts of pipe connection. If
leakage stops, then proceed
steps.
Detach the charge hose from the service port, open
2-way valve and 3-way. Turn the valve rod anticlockwise
until hitting lightly.
To prevent the gas leakage, turn the service port's
cap, the valve rod's cap for 2-way valve and 3-way's
a little more than the point where the torque increases
suddenly.
After attaching the each caps, check the gas leakage
around the caps.
CAUTION:
1.If the refrigerant of the air conditioner leaks, it is necessary to
discharge all the refrigerant. Vacuumize first, then charge the liquid
refrigerant into air conditioner according to the amount marked on
the name plate.
2.Please do not let other refrigerant, except specified one (R410A),
or air enter into the cooling circulation system. Otherwise, there will be
abnormal high pressure in the system to make it crack and lead to
personal injuries.
If it does not stop gas leakage, discharge
whole refrigerants from the service port.
After flaring work again and vacuumize,
fill up prescribed refrigerant from the gas
cylinder.
Anti countercurrent joint
3-way valve
2-way valve
7
6
6
6
1
2
3
1
3
4
5
6
7
8
7
3-way valve
2-way valve
3-way valve
2-way valve
AU182AFERA
Tube(for R410A)
3-way valve
Valve rod cap
Valve rod cap
7
7
Open
90
O
Содержание
- Fix the unit to concrete or block with bolts 10mm and nuts firmly and horizontally when fitting the unit to wall surface roof or rooftop fix a supporter surely with nails or wires in consideration of earthquake and strong wind 2
- Fixing of outdoor unit 2
- If vibration may affect the house fix the unit by attaching a vibration proof mat 2
- Indoor unit 2
- Outdoor unit 2
- Power source 2
- Selection of installation place 2
- Selection of pipe 2
- Carry out based on the neighboring pillars or lintels a proper leveling for the plate to be fixed against the wall then temporarily fasten the plate with one steel nail 2 make sure once more the proper level of the plate by hanging a thread with a weight from the central top of the plate then fasten securely the plate with the attachment steel nail 3 find the wall hole location a using a measuring tape 3
- Drawing of pipe 3
- Fitting of the mounting plate and positioning of the wall hole 3
- Fix to side bar and lintel a mounting bar which is separately sold and then fasten the plate to the fixed mounting bar 3
- Indoor unit 3
- Installation of the indoor unit 3
- Left left rear piping 3
- Making a hole on the wall and fitting the piping hole cover 3
- Rear piping 3
- Refer to the previous article when the mounting plate is first fixed for the position of wall hole 3
- When the mounting plate is first fixed 3
- When the mounting plate is fixed side bar and lintel 3
- Connecting the indoor outdoor electric cable 4
- Fixing the indoor unit body 4
- Indoor unit 4
- Removing the wiring cover 4
- When connecting the cable after installing the indoor unit 4
- When connecting the cable before installing the indoor unit 4
- Easily demount cleaning of indoor unit 5
- Indoor unit 5
- Attaching drain elbow 6
- Be careful that matters such as wastes of sands etc shall not enter the pipe the standard pipe length is 5m the better vertical distance between the indoor unit and the outdoor unit ranges between 2m and 5m if it is over 5m the function of the unit will be affected if the pipe has to be lengthened the refrigerant should be charged according to 30 g m but the charge of refrigerant must be conducted by professional air conditioner engineer before adding additional refrigerant perform air purging from the refrigerant pipes and indoor unit using a vacuum pump then charge additional refrigerant 6
- Connection 6
- Connection of pipes 6
- Installation of outdoor unit 6
- Outdoor indicator board 6
- Outdoor unit 6
- Outdoor unit 7
- Purging method to use vacuum pump 7
- Check for installation and test run 8
- Check items for test run 8
- Correct incorrect 8
- Cutting and flaring work of piping 8
- Flare tooling die 8
- Full disconnection circuit breaker must be installed in fixed wiring 8
- On drainage 8
- Pipe cutting is carried out with a pipe cutter and burs must be removed after inserting the flare nut flaring work is carried out 8
- Please install the drain hose so as to be downward slope without fail please don t do the drainage as shown below 8
- Please kindly explain to our customers how to operate through the instruction manual 8
- Please pour water in the drain pan of the indoor unit and confirm that drainage is carried out surely to outdoor in case that the attached drain hose is in a room please apply heat insulation to it without fail 8
- Power source installation 8
- The power source must be exclusively used for air conditioner over i5a in the case of installing an air conditioner in a moist place please install an earth leakage breaker for fixed wiring installation a contact separation in all poles that provide full disconnection under overvoltage category iii conditions should be installed the disconnection must be incorporated in the fixed wiring in accordance with the wiring rules eg a approved all poles 8
Похожие устройства
- Haier AS182AVERA Сервис мануал
- Haier AS182AVERA Технические данные
- Haier AU36NAHERA Инструкция по монтажу
- Haier AU422AIERA Инструкция по монтажу
- Haier AU42NAIERA Инструкция по монтажу
- Haier AU522AIERA Инструкция по монтажу
- Haier AU52NAIERA Инструкция по монтажу
- Haier AC422AFERA Инструкция по эксплуатации
- Haier AC522AFERA Инструкция по эксплуатации
- Haier AU142AAERA Инструкция по монтажу
- Haier AD09LS1ERA Руководство по эксплуатации
- Haier AD09LS1ERA Сервис мануал
- Haier AD12LS1ERA Руководство по эксплуатации
- Haier AD12LS1ERA Сервис мануал
- Haier AD18LS1ERA Руководство по эксплуатации
- Haier AD24LS1ERA Руководство по эксплуатации
- Haier AD18LS1ERA Сервис мануал
- Haier AC18CS1ERA(S) Сервис мануал
- Haier AC24CS1ERA(S) Сервис мануал
- Haier 3U19FS1ERA Сервис мануал