Haier 1U36LP2VHA [9/42] English section a

Содержание

Step 3 3 ENGLISH Remove the adapter and hose connection from the suction line port and replace the cap Hoses should not be removed and service valves should not be opened until any additional refrigerant needed fora refrigerant line longer than 25 ft has first been added Step 3 4A 3 4B Remove the cap from the liquid line valve Using the hex wrench open the valve then replace and tighten the cap Step 3 5 A 3 5B Remove the cap from the suction line valve Using the hex wrench open the valve then replace and tighten the cap Step3 4B Step3 5A Step 3 6 Wrap the lineset drain line and wiring starting at the bottom of the bundle with an overlap type wrap concluding at the piping hole Use a sealant to seal the piping hole opening to prevent weather elements from entering the building Illustration 6 Verify the condensate drain line has a constant pitch downward for proper water flow There should be no kinks or rises in the tubing which may cause a trapping effect resulting in the failure of the condensate to exit the piping Step 3 5 B Step 3 6 Illustration 6 SECTION A INSTALLATION PAGE 9

Скачать