Haier 1U25S2SQ1FA [6/54] Installation instructions

Haier 1U25S2SQ1FA [6/54] Installation instructions

 
               

                

 

              

 

 

 
 
             

  

 
 
 

 

 
 
 


 

            




               

 







 

 
      
      
      
      
      

3
The maximum refrigerant charge amount (M)
gkMgkM
1.0
1.1
1.45
0.9
0.92
1.35
1.6
59.059.0
1.6
1U25S2SQ1FA
1U35S2SQ1FA
1U50S2SR1FA
1U70S2SR1FA
1U25BEFFRA
1U35BEFFRA
1U50JEFFRA
1U68REFFRA
1U25S2PJ1FA 1U35S2PJ1FA
unit model
unit model
gkM
0.85
1.14
1.35
1U25S2SM1FA
1U35S2SM1FA
1U50S2SJ2FA
unit model

Содержание

Loading and Unloading Transporting Management Storage Requirements Loading and Unloading Requirements 1 The products shall be carefully handled during loading and unloading 2 Rude and barbarous handling such as kicking throwing dropping bumping pulling and rolling is not allowed 3 The workers engaged in loading and unloading must be subject to necessary trainings on the potential hazards caused by barbarous handling 4 Dry powder extinguishers or other suitable fire extinguishing apparatus within the period of validity shall be equipped at the loading and unloading site 5 The untrained personnel cannot be engaged in loading and unloading of flammable refrigerants air conditioner 6 Before loading and unloading anti static measures shall be taken and phones cannot be answered during loading and unloading 7 Smoking and open fire are not allowed around the air conditioner Transporting Management Requirements English 1 The maximum transporting volume of finished products shall be determined as per local regulations 2 The vehicles used for transporting shall be operated as per local laws and regulations 3 Dedicated after sales vehicles shall be used for maintenance and exposed transporting cylinders and the products to be maintained is not allowed 4 The rain cover or similar shielding material of transporting vehicles shall be provided with retardancy 5 Leakage warning device of flammable refrigerant shall be installed inside the closed type compartment 6 Anti static device shall be equipped inside the compartment of transporting vehicles 7 Dry powder extinguishers equipped inside the driver s cab or other suitable fire extinguishing apparatus within the period of of refrigerant certain validity flame shall be 8 Orange white or red white reflective stripes shall be pasted on the sides and tail of the transporting vehicles to remind the vehicles behind of keeping distance 9 The transporting vehicles shall run at a constant speed and heavy acceleration deceleration shall be avoided 10 Combustibles or the static articles cannot be transported simultaneously 11 High temperature area shall be avoided during transporting and necessary radiating measures shall be taken in case the temperature inside the compartment is too high Storage Requirements 1 The storage package of equipment used shall be such that no leakage of refrigerant will be caused due to mechanical damage of the equipment inside 2 The maximum quantity of the equipment allowed to be stored together shall be determined as per local regulations Installation Instructions Installation Precautions WARNING The area of the room in which R32 refrigerant air conditioner is installed cannot be less than the minimum area specified in the table below to avoid potential safety problems due to out of limit concentration inside the room caused by leakage of refrigerant from refrigeration system of the indoor unit of refrigerant Once the horn mouth of connecting lines is fastened it may not be used again the air tightness may be affected A whole connector wire shall be used for indoor outdoor unit as required in the operation specification of installation process and operation instructions Minimum Room Area Type LFL kg m3 hv m Total Mass Charged kg Minimum Room Area m2 1 224 R32 0 306 1 836 2 448 3 672 4 896 6 12 7 956 0 6 29 51 116 206 321 543 1 0 10 19 42 74 116 196 1 8 3 6 13 23 36 60 2 4 9 15 24 40 2 2 The maximum refrigerant charge amount M M kg unit model M kg 1 0 1U25BEFFRA 0 9 1U25S2SM1FA 0 85 1U35BEFFRA 1U50JEFFRA 0 92 1 35 1U35S2SM1FA 1U50S2SR1FA 1 1 1 45 1 14 1 35 1U70S2SR1FA 1 6 1U68REFFRA 1 6 1U25S2PJ1FA 0 95 1U35S2PJ1FA 0 95 unit model 3 1U25S2SQ1FA 1U35S2SQ1FA M kg unit model 1U50S2SJ2FA

Скачать