Installation Procedure Refrigerant piping 5 Air discharging method After finishing connection of refrigerant pipe it shall perform air tightness test The air tightness test adopts nitrogen tank to give pressure according to the pipe connection mode as the following figure shown The gas and liquid valve are all in close state In order to prevent the nitrogen entering the circulation system of outdoor unit tighten the valve rod before giving pressure both gas and liquid valve rods Low pressure peizometer High pressure peizometer 3 way valve totally closed Gas side Indoor Outdoor Completely tight med Comp etely tight ned ba Flare part CjMeter separator ng valve Flare part Manhole Dropping valve Nitrogen tank Indoor units Outdoor units 2 way valve totally closed Liquid side First step 0 3MPa 3 0kg cm2g pressurize over 3 minutes Second step 1 5Mpa 15kg cm2g pressurize over 3 minutes Large leakage will be found LINE PRESSURE GAUGE CYLINDER PRESSURE GAUGE TUBING BRING BRAZED SWEAT JOINT Third step 3 0 MPa 30kg cm2g pressurize about 24 hours Little leakage will be found LARGE SLIP ON CONNECTOR SERVICE HOUSE Check if the pressure drops The pressure does not drop passed The pressure drops check the leaking point From pressurizing to 24 hours later each 1 C difference of ambient temperature will make 0 01MPa 0 1kg cm2g pressure change It shall be corrected during test Checking the leaking point In the first to third test steps if the pressure drops check the leakage in each joint use sense of hearing feeling and soap water etc methods to find the leaking point After confirming the leaking point welding it again or tighten the nut tightly again 9 CYLINDER OF NITROGEN

Скачать