LG CordZero A9N-Core [18/133] Wall mounted installation

LG CordZero A9N-Core [18/133] Wall mounted installation
17
EN
EN
8
Anchor the charging station to the wall with the
stand anchoring screw j.
9
Plug the power cord into the power outlet.
Use double-sided tape
Use double-sided tape to attach the wall anchoring
block a to the charging station and the wall.
Do not use double-sided tape on wallpaper.
Remove the center section of double-sided
tape. Attach the wall anchoring block to the
charging station by using the tape.
Attach the second piece of double-sided tape
to the other side of the wall anchoring block,
and use it to temporarily anchor the charging
station to the wall in the desired location.
Wall-Mounted Installation
For wall-mounted installations, the charging station
must be attached securely to the wall using the
provided (short) wall anchoring screws.
1
Connect the power adapter to the port on the
back of the charging station.
2
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
3
Hold the charging station at least 1 m from the
floor and near enough to easily reach a power
outlet. Mark the positions of the screw holes
on the wall.
4
Drill 2 holes at the marked positions and insert
the drywall anchor.
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
For drywall anchor: use 6.5 mm drill bit
Recommended diameter of hole: 6.5 mm
Recommended depth: 60 mm
If screwing into drywall, the drywall anchor
should be used.
1m

Содержание

Скачать