Kawasaki NINJA ZX-7RR (1997-2003) [178/364] 12 crankshaft transmission

Содержание

8 12 CRANKSHAFT TRANSMISSION Measure the connecting rod big end bore diameter and mark each connecting rod big end in accordance with the bore diameter Bore Diameter Mark Around Weight Mark A O or no mark NOTE O Tighten the connecting rod big end nuts to the specified torque see Connecting Rod Installation O The mark already on the big end should almost coincide with the measurement Connecting Rod Big End Bore Diameter Marks None 37 000 37 008 mm O 37 009 37 016 mm Select the proper bearing insert in accordance with the combination of the connecting rod and crankshaft coding Install the new inserts in the connecting rod and check insert crankpin clearance with the plastigage Con rod Big End Bore Diameter Marking Crankpin Diameter Mark Size Color Part Number None O Brown 92028 1625 None None O o o Black 92028 1624 Blue 92028 1623 None Bearing Insert Crankshaft Main Bearing Insert Jouma Wear Using a plastigage press gauge A measure the bearing insert journal B clearance NOTE O Tighten the crankcase bolts to the specified torque see Crankcase Assembly ODo not turn the crankshaft during clearance measurement OJournal clearance less than 0 025 mm can not be measured by plastigage however using genuine parts maintains the minimum standard clearance Crankshaft Main Bearing Insert Joumal Clearance Standard 0 012 0 036 mm Service Limit 0 07 mm If clearance is within the standard no bearing replacement is required If clearance is between 0 036 mm and the service limit 0 07 mm replace the bearing inserts with inserts painted blue A Check insert journal clearance with the plastigage The clearance may exceed the standard slightly but it must not be less than the minimum in order to avoid bearing seizure If clearance exceeds the service limit measure the diameter of the crankshaft main journal

Скачать