Kawasaki NINJA ZX-7RR (1997-2003) [270/364] 6 steering

Содержание

13 6 STEERING Apply grease to the lower inner race A and drive it onto the stem Special Tool Steering Stem Bearing Driver 57001 1344 B Steering Stem Bearing Driver Adapter 57001 1345 C Install the bolts A and horn B as shown Apply grease to the upper inner race and install it in the head pipe Apply grease to the O ring Install the stem through the head pipe and the upper inner race and install the O ring on the stem shaft while pushing up on the stem base A Install the stem cap B and hand tighten the stem nut C NOTE O Install the steering stem nut so that the stepped side faces down Install the stem head Install the washer and tighten the stem head nut lightly Settle the inner races in place as follows OTighten the stem nut to 54 N m 5 5 kg m 40 ft lb of torque To tighten the steering stem nut to the specified torque hook the wrench on the stem nut and pull the wrench at the hole by 30 5 kg A force in the direction shown Special Tool Steering Stem Nut Wrench 57001 1100 B O Check that there is no play and the steering stem turns smoothly without rattles If not the bearings on the inner races may be damaged OAgain back out the stem nut a fraction of a turn until it turns lightly Turn the stem nut lightly clockwise until it just becomes hard to turn Do not overtighten or the steering will be too tight Torque Steering Stem Nut Hand tight or 4 9 N m 0 50 kg m 43 In lb Install the front fork see Suspension chapter NOTE O Tighten the fork upper damp bolts first next the stem head nut last the fork lower damp bolts Torque Steering Stem Head Nut 54 N m 5 5 kg m 40 ft lb Upper Front Fork Clamp Bolts 21 N m 2 1 kg m 15 ft lb Lower Front Fork Clamp Bolts ZX750N 21 N m 2 1 kg m 15 ft lb Lower Front Fork Clamp Bolts ZX750P 28 N m 2 9 kg m 21 ft lb

Скачать