APC smart-ups smc1500i-2u [5/16] Installation

APC smart-ups smc1500i-2u [5/16] Installation
Smart-UPS C 1000/1500 Va 120/230 Vac Rack-Mount 2U4
Installation
For UPS installation information, refer to the Installation Guide for the Smart-UPS
C 1000/1500 VA
Rack-Mount 2U included with the UPS.
The Installation Guide is also available on the Documentation CD included with the UPS and on the
APC by Schneider Electric Web site, www.apc.com.
Operation
Note: The UPS will charge to 90% capacity in the first three hours of normal operation.
Do not expect full battery runtime capability during this initial charge period.
1. Connect equipment to the UPS.
2. Connect the UPS to a two pole, three wire, grounded source.
Connect equipment to the UPS
CAUTION
RISK OF EQUIPMENT DAMAGE
Adhere to all local and national electrical codes.
Wiring should be performed by qualified electrician.
Always connect the UPS to a grounded outlet.
Failure to follow these instructions can result in equipment damage
USB port: Connect to a computer to use power management software.
Serial port: Connect a serial port cable (not supplied) to use power management software.
Chassis ground screw: Connect the ground leads on transient voltage devices to the chassis ground screw(s), located on
the rear panel of the UPS.
su0628b

Содержание