Gross g985 57440 [11/20] Operating procedure

Содержание

During operation the air pressure should not exceed the max value 6 3 atm Reduction of the operating pressure leads to power losses increase to premature wear of the tool The air supply should be performed through a hose with the inside diameterat least 10 mm When working with the tool use the personal protective equipment goggles earmuffs gloves ply 2 droplets per minute If the use of an automatic air line is not possible apply 4 5 droplets of air tool oil to the inlet pipe opening oil with higher Always first connect and then before each viscosity the air connect use may of the tool deteriorate supply hose it the to Using of performance to the tool air preparation at unit Install the drive socket on the square connection Check the set direction of rota tion To screw screws and nuts set the switch in the F direction of rotation Forward To unscrew screws and nuts set the switch in the OPERATING PROCEDURE R Reverse the Screw the branch pipe to connect the hose to the input connect direction Check torque unscrewing of the rotation position of regulator the when maximum torque is used when screwing the torque should meet the type size and durability of the threaded joint NOTE The rotation control switch may only be used when the tool isturned off CAUTION Impact drive sockets may only be used NOTE Use only the tool intended for the operation with impact loads Do not use coupling arrangements NOTE Before the first useof the tool apply 4 5 droplets of oil to the inlet opening before connecting the hose To turn on the tool press the switch and hold it pressed when To lubricate the tool apply air tool oils with ISO VG 32 vis To turn off the tool release the switch cosity and an automatic air line lubricator adjusted to sup NOTE Disconnect the air supply hose from the tool before changing its accessories or adjusting it performing a work operation

Скачать