12 English
• A continuous flow “Shah” sound is heard
when the system is in COOLING OPERATION
or at a stop.
The noise is heard when the drain pump is in
operation.
Moisture removed from the indoor air during the
COOLING OPERATION is drained. (The drain-
ing device is provided as an optional part.)
• A “Pishi-pishi” squeaking sound is heard
when the system is in operation or after the
stop of operation.
Expansion and contraction of plastic parts
caused by temperature change makes this
noise.
VIII.DUST FROM THE UNITS
• Dust may blow out from the unit after starting
operation from long resting time.
Dust absorbed by the unit blows out.
IX. THE UNITS GIVE OFF ODORS
• During operation
The unit absorbs the smell of rooms, furniture,
cigarettes, etc., and then emits them.
If odor is a concern, you can set to zero airflow
rate when the indoor temperature reaches the
set temperature.
For details, contact your Daikin dealer.
X. THE UNIT DOES NOT COOL EFFECTIVELY.
• The unit is operating in program dry mode.
This is because program dry mode operates so
that the indoor temperature decreases as little
as possible.
Lower the indoor temperature using COOLING
OPERATION, and then use PROGRAM DRY
OPERATION.
(Refer to “CHARACTERISTICS OF THE PRO-
GRAM DRY OPERATION” on page 6.)
• Read through characteristics of the COOLING
OPERATION, characteristics of the HEATING
OPERATION, and characteristics of the PRO-
GRAM DRY OPERATION on page 5, 6.
Please check before requesting a service call.
1. If the system does not operate at all.
• Check if no fuse has blown.
Turn off the power supply.
• Check if the power circuit breaker is blown.
Turn the power on with the power circuit
breaker switch in the off position.
Do not turn the power on with the power circuit
10. TROUBLE SHOOTING
breaker switch in the trip position.
(Contact your dealer.)
• Check if there is a power failure.
Wait until power is restored. If power failure
occurs during operation, the system automati-
cally restarts immediately after the power sup-
ply recovers.
2. If the system stops operating after operation
is complete.
• Check if the air inlet or outlet of outdoor or
indoor unit is blocked by obstacles.
Remove the obstacle and make it well-venti-
lated.
• Check if the air filter is clogged.
Ask a qualified service person to clean the air
filters.
(Refer to “MAINTENANCE” on page 8.)
If the air filter is clogged, the airflow rate will
drop and as a result the performance will also
drop.
In addition, this may cause dew condensation
at the air outlet.
(Refer to “MAINTENANCE” on page 8.)
3. The system operates but it does not suffi-
ciently cool or heat.
• If the air inlet or outlet of the indoor or the out-
door unit is blocked with obstacles.
Remove the obstacle and make it well-venti-
lated.
Obstacles decrease the airflow rate, and
cause performance decrease and breakage
when discharged air is suctioned.
They cause a waste of electricity, and that may
stop the devices.
• If the air filter is clogged.
Ask a qualified service person to clean the air
filters.
(Refer to “MAINTENANCE” on page 8.)
A decrease in the airflow volume of the air con-
ditioner will result and the performance of the
air conditioner will be degraded if the air filter is
clogged with dust or dirt.
In addition, this may cause dew condensation
at the air outlet.
(Refer to “MAINTENANCE” page 8.)
• If the set temperature is not proper (Set to an
appropriate temperature, airflow rate, and dis-
charge direction.).
Ta b
Trip position
Power circuit breaker
(earth leakage breaker)
ON
OFF
UntitledBook1.book Page 12 Wednesday, December 14, 2011 4:14 PM
Содержание
- Floor standing type 1
- Fvq71cveb fvq100cveb fvq125cveb fvq140cveb 1
- Operation manual 1
- Split system air conditioner 1
- Bertaraf gereksinimleri 4
- Disposal requirements 4
- Disposal requirements vorschriften zur entsorgung instructions d élimination requisitos para la eliminación specifiche di smaltimento προ ÿ ποθεσεισ απορριψησ vereisten voor het opruimen requisitos para a eliminação требования к утилизации bertaraf gereksinimleri 4
- Instructions d élimination 4
- Requisitos para a eliminação 4
- Requisitos para la eliminación 4
- Specifiche di smaltimento 4
- Vereisten voor het opruimen 4
- Vorschriften zur entsorgung 4
- Προϋποθέσεις απόρριψης 4
- Требования к утилизации 4
- Contents 5
- Important information regarding the refrig erant used 5
- Indoor unit 5
- Names and functions of parts 5
- Outdoor unit 5
- Precautions for group control system or two remote controller control system 5
- What to do before opera tion 5
- What to do before operation 5
- Safety precautions 6
- Due to high voltage do not open control box lid for ten minutes after the safety breaker is switched off 8
- Operation range 8
- At the start of operation and after defrosting operation 9
- Characteristics of the cooling operation cooling operation and automatic cooling operation 9
- Characteristics of the heating operation heating operation and automatic heating operation 9
- If drain piping is not carried out properly dirt and debris may be accumulated in the drain pipe and cause water leakage if it occurs stop the air con ditioner and consult with you dealer for assistance 9
- Installation site 9
- Low airflow rate is used prevent humidity increase 9
- Operation characteris tics 9
- Operation characteristics 9
- Operation procedure 9
- Pay attention to running noises too 9
- Regarding drainage of drain piping 9
- Regarding wiring 9
- Start of operation 9
- A left and right direction 10
- A left and right direction remote controller 10
- Airflow direction adjust 10
- B up and down direction by hand 10
- Characteristics of the program dry operation 10
- Defrost operation frost removal oper ation for the outdoor unit 10
- Press the airflow direction adjust button to select the air direction as follow ing 10
- Regarding outside air temperature and heat ing capacity 10
- There are 2 ways of adjusting the airflow direction 10
- Adjusting up and down airflow by hand 11
- B up and down direction 11
- Group no 11
- Horizontal flaps 11
- How to adjusting up and down air flow 11
- Interlocking flaps for group no 2 11
- Interlocking flaps for group no 4 11
- Lower flaps 11
- Movement of left and right airflow flaps 11
- Optimum operation 11
- The group no is stamped on the top and back of each flap 11
- Upper flaps 11
- Upward blow 11
- Vertical blow 11
- How to clean the air filter 12
- Maintenance for service personnel 12
- Air filter 13
- Filter guide 13
- How to clean air outlet suction grille exterior and remote con troller 13
- Suction grille 13
- Cleaning before and after sea sonal use start up after a long stop 14
- Not a malfunction of the air conditioner 14
- Not a malfunction of theair conditioner 14
- What to do to stop the system for a long period 14
- Power circuit breaker earth leakage breaker 16
- Trip position 16
- Trouble shooting 16
- Indoor unit no in which a malfunction occurs 17
- Inspection display 17
- Malfunction code 17
- Operation lamp 17
- P170549 14j em11a037 18
Похожие устройства
- Daikin FVQ125C / RZQSG125L8Y1 Схема
- Daikin FVQ125C / RZQSG125L8Y1 Каталог оборудования Daikin
- Daikin FUQ100C / RZQG100L9V1 Инструкция по эксплуатации
- Daikin FUQ100C / RZQG100L9V1 Схема
- Daikin FUQ100C / RZQG100L9V1 Каталог оборудования Daikin
- Daikin FUQ125C / RZQG125L8Y1 Инструкция по эксплуатации
- Daikin FUQ125C / RZQG125L8Y1 Схема
- Daikin FUQ125C / RZQG125L8Y1 Каталог оборудования Daikin
- Daikin FUQ71C / RZQG71L9V1 Инструкция по эксплуатации
- Daikin FUQ71C / RZQG71L9V1 Схема
- Daikin FUQ71C / RZQG71L9V1 Каталог оборудования Daikin
- Daikin FUQ125C / RZQG125L9V1 Инструкция по эксплуатации
- Daikin FUQ125C / RZQG125L9V1 Схема
- Daikin FUQ125C / RZQG125L9V1 Каталог оборудования Daikin
- Daikin FVQ100C / RZQSG100L9V1 Инструкция по эксплуатации
- Daikin FVQ100C / RZQSG100L9V1 Схема
- Daikin FVQ100C / RZQSG100L9V1 Каталог оборудования Daikin
- Abat ПКА 6-1/3П Инструкция по эксплуатации
- Abat ПКА 6-1/3П Паспорт Abat ПКА 6-1/3П
- Abat ПКА 6-1/3П Руководство по установке и подключению ПКА