Duke FWM3-22PR6-230 (FWM3-22-230) [18/34] Operation
![Duke FWM3-23PR6-230 (FWM3-23-230) [18/34] Operation](/views2/1331323/page18/bg12.png)
Installation and Operation of Product Holding Cabinets
18
OPERATION
The following procedures must be performed on a
daily basis.
OPENING CHECKLIST
1. Ensure proper Pan Covers are inserted into the
correct locations for fried and broiled products.
2. Place the Power Switch, located on the front of the
Product Holding Unit, in the ON position.
3. Allow the Product Holding Cabinet to heat for at
least 20 min. or until the temperature disappears
and the menu bars display the pre-programmed
product names: “EGGS”, “FISH”, “----“ or “EMTY”
(no product).
OPERATION INSTRUCTIONS AND
ADJUSTMENTS
1. If the menu bars display temperature at any time
during operation of the Product Holding Cabinet,
discontinue use of the affected shelf until the cabinet
is serviced.
2. Refer to the KEYPAD PROGRAMMING section
of the manual for instructions on using and
programming the keypad.
CLOSING CHECKLIST
1. Place the Power Switch in its OFF position.
2. Remove all pans and pan covers.
3. Allow the cabinet to cool for approximately
30 minutes.
4. Refer to the CLEANING INSTRUCTIONS section
of the manual for proper care and cleaning of the
cabinet.
: Electrical Shock Hazard, unplug
the cabinet before cleaning it.
: Do not wash with water jet
or hose.
: Bottom and sides of warmer
wells are very hot and cool slowly.
CAUTION: Do not use caustic cleaners, acids,
ammonia products or abrasive cleaners or abrasive
cloths. These can damage the stainless steel
and plastic surfaces.
CLEANING INSTRUCTIONS
1. Wipe down the interior and exterior of the Product
Holding Cabinet with warm water and mild detergent
using a soft cloth. Do not use excessive amounts
of water.
2. Clean pans and pan covers using mild detergent
and warm water.
3. Ensure all soap is rinsed from plastic pans and
pan covers.
STAINLESS STEEL CARE
Cleaning
Stainless steel contains 70-80% iron, which will rust
if not properly maintained. It also contains 12-30%
chromium, which forms an invisible passive, protective
lm that shields against corrosion. If the lm remains
intact, the stainless steel will remain intact. However,
if the lm is damaged, the stainless steel can break
down and rust. To prevent stainless steel breakdown,
follow these steps:
CAUTION: Never use any metal tools. Scrapers,
les, wire brushes or scouring pads (except for
stainless steel scouring pads) will mar the surface.
CAUTION: Never use steel wool, which will leave
behind particles that rust.
CAUTION: Never use acid-based or chloride-
containing cleaning solutions, which will break
down the protective lm.
CAUTION: Never rub in a circular motion.
CAUTION: Never leave any food products or
Содержание
- Installation and 1
- Operation manual 1
- Product holding cabinet 1
- Table of contents 3
- Electrical warnings 4
- Installation and operation of product holding cabinets 4
- Caution 5
- Installation and operation of product holding cabinets 5
- Installation and operation of product holding cabinets 6
- Manufacturer s introduction 6
- Ac voltage 7
- Frequency 7
- Installation and operation of product holding cabinets 7
- Model fwm3 13 7
- Model shipping weight 7
- Specifications 7
- Ac voltage 8
- Frequency 8
- Installation and operation of product holding cabinets 8
- Model fwm3 14 8
- Model shipping weight 8
- Ac voltage 9
- Frequency 9
- Installation and operation of product holding cabinets 9
- Model fwm3 21 9
- Model shipping weight 9
- Ac voltage 10
- Frequency 10
- Installation and operation of product holding cabinets 10
- Model fwm3 22 10
- Model shipping weight 10
- Ac voltage 11
- Frequency 11
- Installation and operation of product holding cabinets 11
- Model fwm3 23 11
- Model shipping weight 11
- Ac voltage 12
- Frequency 12
- Installation and operation of product holding cabinets 12
- Model fwm3 24 12
- Model shipping weight 12
- Ac voltage 13
- Frequency 13
- Installation and operation of product holding cabinets 13
- Model fwm3 41 13
- Model shipping weight 13
- Ac voltage 14
- Frequency 14
- Installation and operation of product holding cabinets 14
- Model fwm3 42 14
- Model shipping weight 14
- Ac voltage 15
- End front 15
- Frequency 15
- Installation and operation of product holding cabinets 15
- Model fwm3 51 15
- Model shipping weight 15
- Bottom 0 16
- Clearance 16
- Clearance requirements 16
- Earthing instructions 16
- In inches 16
- Installation and operation of product holding cabinets 16
- Installation codes and standards 16
- Installation instructions 16
- Left side 0 16
- Rear open 16
- Requirement 16
- Right side 0 16
- Unit placement 16
- Unpacking unit 16
- External equipotential bonding terminal export only 17
- Figure 1 removal of base pan 17
- Figure 2 placement of bottom unit 17
- Figure 3 fwm3 24 in stacked arrangement 17
- Installation and operation of product holding cabinets 17
- Stacking units 17
- Adjustments adjustments 18
- Cleaning 18
- Cleaning instructions 18
- Closing checklist 18
- Installation and operation of product holding cabinets 18
- Opening checklist 18
- Operation 18
- Operation instructions and 18
- Stainless steel care 18
- Heat tint 19
- Installation and operation of product holding cabinets 19
- Keypad programming 19
- Power up 19
- Preserving restoring 19
- Installation and operation of product holding cabinets 20
- Time decrement 20
- Timer operation 20
- Change meal set 21
- Display link hold time temperature 21
- Enter menu mode 21
- Exit menu mode 21
- Installation and operation of product holding cabinets 21
- Menu mode 21
- Electronic control fault indications 22
- Installation and operation of product holding cabinets 22
- Service hot line 22
- Temperature check procedure 22
- Troubleshooting 22
- Installation and operation of product holding cabinets 23
- Parts lists and illustrations 23
- Installation and operation of product holding cabinets 24
- Parts lists and illustrations continued 24
- Before replacement 25
- Caution 25
- Id number verify heater element 25
- Installation and operation of product holding cabinets 25
- Not shown ce only 25
- Parts lists and illustrations continued 25
- See service label below 25
- Ce only 26
- Fwm 1 high internal wiring schematic 26
- Installation and operation of product holding cabinets 26
- Wiring schematics 26
- Ce only locations all units 27
- Fwm 2 high internal wiring schematic 27
- Heater rtd keypad 27
- Hmc 34 controller 27
- Installation and operation of product holding cabinets 27
- Sps 204 keypad 27
- Usb host 27
- Fwm 4x1 internal wiring schematic 28
- Hmc 34 controller 28
- Installation and operation of product holding cabinets 28
- Sps 204 keypad 28
- Units with rear displays 28
- Usb host 28
- Ce only 29
- F1 f2 f3 f4 29
- Fwm 4x2 internal wiring schematic 29
- Hmc 34 controller 29
- Installation and operation of product holding cabinets 29
- Sps 204 keypad 29
- Usb host 29
- Ce only 30
- F1 f2 f3 30
- Fwm 5x1internal wiring schematic 30
- Hmc 34 controller 30
- Installation and operation of product holding cabinets 30
- R1 r2 r3 30
- Sps 204 keypad 30
- Usb host 30
- Canada latin america 33
- Countries 33
- Customer assistance 33
- Duke asia pacific 33
- Duke corporate 33
- Duke emea europe middle 33
- Duke emea uk ireland nordic 33
- East africa russia 33
- Duke manufacturing co 34
Похожие устройства
- Mitsubishi Electric PSA-RP100KA / PUHZ-ZRP100VKA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP100KA / PUHZ-ZRP100VKA Инструкция по установке
- Mitsubishi Electric PSA-RP140KA / PUHZ-ZRP140YKA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP140KA / PUHZ-ZRP140YKA Инструкция по установке
- ATESY Ривьера с подлокотником левый / правый 1200 мм Инструкция по эксплуатации
- ATESY Ривьера с подлокотником левый / правый 1200 мм Сертификат
- Mitsubishi Electric PSA-RP140KA / PUHZ-P140VHA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP140KA / PUHZ-P140VHA Инструкция по установке
- Mitsubishi Electric PSA-RP125KA / PUHZ-P125VHA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP125KA / PUHZ-P125VHA Инструкция по установке
- Mitsubishi Electric PSA-RP100KA / PUHZ-P100VHA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP100KA / PUHZ-P100VHA Инструкция по установке
- Mitsubishi Electric PSA-RP125KA / PUHZ-ZRP125VKA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP125KA / PUHZ-ZRP125VKA Инструкция по установке
- Mitsubishi Electric PLA-RP140BA / PUHZ-ZRP140VKA Инструкция по эксплуатации
- Mitsubishi Electric PLA-RP140BA / PUHZ-ZRP140VKA Руководство по установке
- Mitsubishi Electric PLA-RP140BA / PUHZ-ZRP140VKA Сертификат
- Mitsubishi Electric PSA-RP71KA / PUHZ-ZRP71VHA Инструкция по эксплуатации
- Mitsubishi Electric PSA-RP71KA / PUHZ-ZRP71VHA Инструкция по установке
- EQTA BC03 Инструкция по эксплуатации