Compak R100 [11/21] Operation

Compak R8 [11/21] Operation
K04673 | v. 18/07/2016 | Ref. quality process 002/03 | ORIGINAL INSTRUCTIONS
9
Please, check that the three-phase factory installation is correct.
Make sure our socket is EN 60529 and has 3F+N+T and the distribution of the
connection should be as in Figure 2.
Obtain 380V 50Hz or 220V 60 Hz between phases ( ) and 230V 50Hz or 110V
60Hz between Phase and Neutral ( - ).
In order for a correct grind, the burrs have to turn in a counter-clockwise direction.
When plugging in a three-phase grinder for the rst time, check that the burrs turn in
the right direction by opening the cover and looking into the hopper.
If the direction of the burrs is not correct, unplug the grinder and, with the help of a
at-head screwdriver, turn the phase reversal device 180º as soon shown in Figure 1.
When you plug the grinder in again, it should turn counter-clockwise.
NOTE: The coffee grinder should be used in areas with a room temperature below
30/35ºC ( 86/95ºF ) and should not be installed in places (SUCH AS INDUSTRIAL
KITCHENS) where cleaning with water jets is used.
8. OPERATION
8.1. Main switch
The main swith ( ) has 2 positions of use, ON–OFF
ON: Working
OFF: Not working