MCZ Forma B95 [38/46] Operation
![MCZ Forma B95 [38/46] Operation](/views2/1336204/page38/bg26.png)
INSTALLATION AND USE MANUAL
Chapter 6
page 38
Operation
Technical service – MCZ S.p.A. all rights reserved - Reproduction prohibited
6. OPERATION
6.1. PRE-LIGHTING WARNINGS
Do not touch the fireplace stove when it is lit for the first
time. During this phase, the paint finishes drying and
hardens. If you touch the paint, you may expose the steel
surface.
It is good practice to provide plenty of ventilation in the
room during the initial lighting, as the stove will give off a
small amount of smoke and smell of paint.
If necessary, touch up the paint with the aerosol spray in
the original colour (see “Fireplace stove accessories and
inserts")
Do not stay near the fireplace stove, and as previously mentioned,
ventilate the room. The smoke and the smell of paint will vanish after
about one hour of operation. There are no health risks involved.
The fireplace stove will be subject to expansion and contraction during
the stages of lighting and cooling down, and may therefore make slight
creaking noises.
This phenomenon is absolutely normal, the structure being made of
sheet steel, and must not be considered a fault.
It is very important not to bring the stove up to full
heat immediately. Bring it up to temperature
gradually.
This avoids damages to welds and the steel
structure.
Do not demand full heating
performance straight away!
6.2. OPERATING TEST
ATTENTION!!
BEFORE PROCEEDING IN ANY WAY WITH THE
INSTALLATION OF THE CLADDING, CARRY OUT A
GENERAL TEST OF THE FIREPLACE STOVE AS
FOLLOWS:
Raise and lower the fire door 7-8 times to ensure
fluid sliding and that the counterweights do not
produce noise when they come into contact with
the structure (if this anomaly occurs, review chapter
7.1.4)
Check that all of the wiring and the control unit (if
the kit COMFORT AIR VF is installed) are always
placed at a distance from the hot body of the
fireplace stove.
Test the ventilation kit at all speeds and in all
modes (if kit COMFORT AIR VF is installed)
Light the fire at low power to ensure the smoke
connections do not leak smoke or soot. Before
lighting, however, read Chapter 6.
Содержание
- Use and installation manual 1
- Contents 2
- Contents 3
- How to read the manual 4
- Introduction 4
- Manual preservation 4
- Revisions to the publication 4
- These symbols signal specific messages in this booklet 4
- Operating warnings 5
- Safety warnings 5
- Warnings and warranty conditions 5
- Exclusions 6
- Important information for correct disposal of the product in accordance with ec directive 2002 96 ec 6
- Restrictions 6
- Warranty conditions 6
- Installation in accordance with uni 10683 7
- Operating area 7
- Precautions 7
- Connection to the external air intake 8
- Important 8
- Connection to the flue pipe 9
- Flue pipe 9
- Examples of flue pipes 10
- Important 10
- Technical specifications 17
- Installation and assembly 20
- Preparation and unpacking 20
- Selection of operating mode 20
- Forced convection vf 21
- Natural convection vn 21
- Positioning 21
- Release of counterweights 21
- Adjustment of height and balancing 22
- Air inlet for forced ventilation 23
- Air inlet for natural ventilation 23
- Combustion air inlet 23
- Ducts for kit comfort air 23
- External and internal air intake 23
- Connection to the flue pipe 24
- Installation of cladding and hood 24
- Hood ventilation nozzles 25
- Insulating a wooden beam 25
- Insulation of fireplace stove 25
- Comfort air kit natural ventilation and forced 26
- Components of forced ventilation kit with and without illumination 26
- Components of natural ventilation kit with and without illumination 26
- Ventilation 26
- A c d b 27
- Installation of the comfort air kit 29
- Variation for air outlet with container 30
- Variation for air outlet with illumination 30
- Maintenance of air outlet with illumination 31
- Composition of control unit 32
- Control unit 32
- Positioning of the control unit 32
- General information on the control unit 33
- On off 33
- Operation 33
- Light on if present 34
- Replacing the fuse of the control unit 34
- Safety function 34
- Door open switch 35
- Installation of temperature probe 35
- Connections 36
- Replacing the fan 37
- Attention 38
- Do not demand full heating 38
- Operating test 38
- Operation 38
- Performance straight away 38
- Pre lighting warnings 38
- Choice of fuel 39
- Phases for first test lighting 39
- First lighting 40
- Attention 41
- Loading the fuel 41
- Control of combustion 42
- Emergency situations 42
- Cleaning out the ashes 43
- Cleaning the glass 43
- Cleaning the refractory material walls alute 43
- Cleaning to be performed by the user 43
- Maintenance and cleaning 43
- Electric fan 44
- Lubrication and routine maintenance of the extensible guides 44
- Maintenance of kit vf if installed 44
- Cleaning flue pipe 45
- Cleaning to be dealt with by specialized technician 45
- Control unit comfort air 45
- Wiring 45
- E mail mcz mcz it 46
- Fax 39 0434 599598 46
- Internet www mcz it 46
- Mcz group s p a 46
- Telephone 39 0434 599599 pbx 46
- Via la croce n 8 46
- Vigonovo di fontanafredda pn italy 46
Похожие устройства
- MCZ Forma B95 Сертификат
- MCZ Forma 95 dx Инструкция по эксплуатации
- MCZ Forma 95 dx Сертификат
- MCZ Forma 65 Инструкция по эксплуатации
- MCZ Forma 65 Сертификат
- MCZ Forma 115 Инструкция по эксплуатации
- MCZ Forma 115 Сертификат
- MCZ Forma 95 sx Инструкция по эксплуатации
- MCZ Forma 95 sx Сертификат
- MCZ Forma 95 Инструкция по эксплуатации
- MCZ Forma 95 Сертификат
- MCZ Forma 75 sx Инструкция по эксплуатации
- MCZ Forma 75 sx Сертификат
- MCZ Forma 75 dx Инструкция по эксплуатации
- MCZ Forma 75 dx Сертификат
- MCZ Forma T95 Инструкция по эксплуатации
- MCZ Forma T95 Сертификат
- MCZ Forma 75 Инструкция по эксплуатации
- MCZ Forma 75 Сертификат
- MCZ Forma T50 Инструкция по эксплуатации