D-Link DGS-3000-28SC [7/45] General precautions for rack mountable products
![D-Link DGS-3000-28SC [7/45] General precautions for rack mountable products](/views2/1459196/page7/bg7.png)
DGS-3000-28SC Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide
vii
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
modifications. Always follow your local/national wiring rules.
• When connecting or disconnecting power to hot-pluggable power supplies, if offered with your system,
observe the following guidelines:
o Install the power supply before connecting the power cable to the power supply.
o Unplug the power cable before removing the power supply.
o If the system has multiple sources of power, disconnect power from the system by unplugging all
power cables from the power supplies.
o Move products with care; ensure that all casters and/or stabilizers are firmly connected to the system.
Avoid sudden stops and uneven surfaces.
General Precautions for Rack-Mountable Products
Observe the following precautions for rack stability and safety. Also, refer to the rack installation documentation
accompanying the system and the rack for specific caution statements and procedures.
Systems are considered to be components in a rack. Thus, "component" refers to any system as well as to various
peripherals or supporting hardware.
CAUTION: Installing systems in a rack without the front and side stabilizers installed could cause the
rack to tip over, potentially resulting in bodily injury under certain circumstances. Therefore, always
install the stabilizers before installing components in the rack. After installing system/components in a
rack, never pull more than one component out of the rack on its slide assemblies at one time. The
weight of more than one extended component could cause the rack to tip over and may result in
serious injury.
• Before working on the rack, make sure that the stabilizers are secured to the rack, extended to the floor, and
that the full weight of the rack rests on the floor. Install front and side stabilizers on a single rack or front
stabilizers for joined multiple racks before working on the rack.
• Always load the rack from the bottom up, and load the heaviest item in the rack first.
• Make sure that the rack is level and stable before extending a component from the rack.
• Use caution when pressing the component rail release latches and sliding a component into or out of a rack;
the slide rails can pinch your fingers.
• After a component is inserted into the rack, carefully extend the rail into a locking position, and then slide the
component into the rack.
• Do not overload the AC supply branch circuit that provides power to the rack. The total rack load should not
exceed 80 percent of the branch circuit rating.
• Ensure that proper airflow is provided to components in the rack.
• Do not step on or stand on any component when servicing other components in a rack.
NOTE: A qualified electrician must perform all connections to DC power and to safety grounds. All
electrical wiring must comply with applicable local, regional or national codes and practices.
CAUTION: Never defeat the ground conductor or operate the equipment in the absence of a suitably
installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if
uncertain that suitable grounding is available.
CAUTION: The system chassis must be positively grounded to the rack cabinet frame. Do not
attempt to connect power to the system until grounding cables are connected. Completed power and
safety ground wiring must be inspected by a qualified electrical inspector. An energy hazard will exist
if the safety ground cable is omitted or disconnected.
Содержание
- Table of contents 3
- Intended readers 5
- Notes notices and cautions 5
- Typographical conventions 5
- Safety cautions 6
- Safety instructions 6
- General precautions for rack mountable products 7
- Protecting against electrostatic discharge 8
- Chapter 1 introduction 9
- Features 9
- Switch description 9
- Front panel components 11
- Led indicators 11
- Rear panel description 12
- Side panel description 13
- Chapter 2 installation 14
- Installation guidelines 14
- Package contents 14
- Attaching brackets to a switch for rack mounting 15
- Installing the switch without a rack 15
- Connecting a dc power supply 16
- Mounting the switch in a standard 19 rack 16
- Power failure ac power 16
- Power on ac power 16
- Installing power cord retainer 17
- Installing sfp and sfp ports 21
- Connecting the rps to the rps port 22
- Dps 800 rack mount chassis 23
- Installing the rps into a rack mount chassis 23
- Chapter 3 connecting the switch 25
- Switch to end node 25
- Switch to switch 26
- Connecting to network backbone or server 27
- Chapter 4 introduction to switch management 28
- Connecting the console port 28
- Management options 28
- First time connecting to the switch 30
- Password protection 30
- Ip address assignment 31
- Snmp settings 31
- Chapter 5 web based switch configuration 33
- Introduction 33
- Logging onto the web manager 33
- Areas of the user interface 34
- Web based user interface 34
- Web pages 35
- Appendix a technical specifications 36
- Appendix section 36
- General 36
- Physical and environmental 36
- Led indicators 37
- Performance 37
- Port functions 39
- Appendix b cables and connectors 41
- Contact mdi x port mdi ii port 41
- Dgs 3000 28sc layer 2 managed stackable gigabit switch hardware installation guide 41
- Ethernet cable 41
- Figure b 1 the standard rj 45 port and connector figure b 1 the standard rj 45 port and connector 41
- Rj 45 pin assignments 41
- When connecting the switch to another switch a bridge or hub a normal cable is necessary please review these products for matching cable pin assignment the following diagrams and tables show the standard rj 45 receptacle connector and their pin assignments 41
- Console cable 42
- Console rj 45 pin assignments 42
- Dgs 3000 28sc layer 2 managed stackable gigabit switch hardware installation guide 42
- Figure b 2 console to rj 45 cable figure b 2 console to rj 45 cable 42
- Pin console db9 rs232 rj 45 42
- When connecting the switch a pc a console cable is necessary the following diagrams and tables show the standard console to dj 45 receptacle connector and their pin assignments 42
- Dgs 3000 28sc layer 2 managed stackable gigabit switch hardware installation guide 43
- Figure b 3 dps cb150 2ps cable figure b 3 dps cb150 2ps cable 43
- Pin 2 pin 14 pin 43
- Redundant power supply rps cable 43
- Rps 14 pin to two 2 pin dc power cable pin assignments 43
- When connecting the switch to a redundant power supply an rps cable is necessary please review these products for matching cable pin assignment the following diagrams and tables show the dps cb150 2ps receptacle connector and their pin assignments 43
- Warranties 44
- Technical support information 45
Похожие устройства
- D-Link DGS-3000-28SC Руководство пользователя _Web UI_
- D-Link DGS-3120-24SC/*EI Руководство пользователя _CLI_
- D-Link DGS-3120-24SC/*EI Руководство по установке
- D-Link DGS-3120-24SC/*EI Руководство пользователя _Web UI_
- D-Link DGS-3427 Руководство пользователя _CLI_
- D-Link DGS-3427 Руководство пользователя _Web UI_
- D-Link DXS-3400-24SC Руководство по установке
- D-Link DXS-3400-24SC Руководство пользователя _CLI_
- D-Link DXS-3400-24SC Руководство пользователя _Web UI_
- D-Link DXS-3400-24TC Руководство пользователя _CLI_
- D-Link DXS-3400-24TC Руководство по установке
- D-Link DXS-3400-24TC Руководство пользователя _Web UI_
- D-Link DGS-3120-24PC/*RI Краткое руководство по установке
- D-Link DGS-3120-24PC/*RI Руководство по установке
- D-Link DGS-3120-24PC/*RI Руководство пользователя _Web UI_
- D-Link DGS-3120-24PC/*RI Руководство пользователя _CLI_
- D-Link DGS-3120-24SC/*RI Руководство по установке
- D-Link DGS-3120-24SC/*RI Руководство пользователя _CLI_
- D-Link DGS-3120-24SC/*RI Руководство пользователя _Web UI_
- D-Link DGS-3120-24TC/*RI Краткое руководство по установке
Скачать
Случайные обсуждения
Ответы 1
Как открыть окно настроек информации о системе веб-интерфейса коммутатора DGS-3000-28SC?
2 года назад
Ответы 1
Какие поля можно настроить в DGS-3000-28SC Layer 2 Managed Stackable Gigabit Switch?
1 год назад