Ecoflam MULTICALOR 100 PR-AB TL VCS 240 [17/64] N o zzle o utput

Ecoflam MULTICALOR 100 PR-AB TL VCS 125 [17/64] N o zzle o utput
17
420010239601 Multicalor 45 ÷ 140 PR/PR
EN
N O ZZLE OUTPUT TYPE : MONARCH F80-BPS
N O ZZLE PUM P PR ESSU R E
RETURN PR ESSU R E BAR 20 bar
GPH 0 4,218 8,436 12,654 16,872 CAPACITY kg/h
4.00 7,52 8,91 13 19 - 22,24
4.50 7,52 8,91 13 21,16 - 24,96
5.00 7,52 9,33 13,38 21,39 - 27,68
5.50 7,52 9,36 13,93 25,6 30 30,56
6.00 9,2 11,42 13,93 17,8 33,45 33,28
6.50 9,2 9,49 11,42 20 36,19 36,00
7.00 9,74 13,38 17,27 24,5 39 38,88
7.50 9,74 13,38 18,66 31,2 41,82 41,6
8.00 9,74 10,87 15,6 25,64 44,55 44,16
9.00 11,16 15 18,4 25,64 36,77 49,92
9.50 12 13,38 18,94 29,53 52,9 52,64
10.50 12,8 13,93 22,29 33,7 58,55 58,24
12.00 13,93 15 22,29 34 66,9 66,56
13.80 16,72 20 31,2 57,9 76,89 76,48
15.30 16,72 20 29,27 43,46 72,54 84,8
17.50 20,9 23,42 36,5 66,27 - 96,96
19.50 22,29 29,53 43,49 64,6 108,74 108,16
21.50 22,8 27,3 40,15 61,28 120 119,04
OUTPUT kg/h
The pum p is adjusted during testing
and inspection to 12 bar. VERIFY: -
That piping system is perfectly sealed;
- That the use of hoses is avoided
whenever is possible (use copper pipes
preferably); - That depression is not greater than 0,45 bar, to avoid pumps cavitation; - That check valve is suitably
designed for the duty; The pump pressure is set at a value of 12 bar during the testing of burners. Before starting the
burner, bleed the air in the pump through the gauge port. Fill the piping with light-oil to facilitate the pump priming.
Start the burner and check the pump feeding pressure. In case the pump priming does not take place during the first
prepurging, with a consequent, subsequent lock-out of the burner, rearm the burner’s lock-out to restart, by pushing
the button on the control box. If, after a successful pump priming, the burner locks-out after the prepurging, due to a
fuel pressure drop in the pump, rearm the burners lock-out to restart the burner. Do not allow the pump to work
without oil for more than three minutes. NOTE: Before starting the burner, ch eck that the return pipe is open. An
even tual obstru ction cou ld dam age the pum p sealing device.
P R IM IN G AN D AD JUSTM EN T OF OIL PU M P
1 - INLET
2 - RETURN
3 - BLEED AND PRESSURE
GAUGE PORT
4 - VACUUM GAUGE PORT
5 - PRESSURE ADJUSTMENT
6 - TO NOZZLE
6
5
4
3
2
1
S
U
N
T
E
C
S
U
N
T
E
C
S
U
N
T
E
C
SUNTEC AJ 6 C-C
6
5
3
2
S
U
N
T
E
C
14
SUNTEC J 7 C-C

Содержание

Похожие устройства

Скачать