Daikin EWWH405DZXEA1 [9/47] Main controller uc

Daikin EWWD610DZXSA2 [9/47] Main controller uc
EWWD_DZ EWWH_DZ
D-EOMWC01405-18EN
9/47
3.4 Basic Control System Diagnostic
MicroTech III controller, extension modules and communication modules are equipped with two status LED (BSP and BUS)
to indicate the operational status of the devices. The BUS LED indicates the status of the communication with the controller.
The meaning of the two status LED is indicated below.
Main Controller (UC)
BSP LED
Mode
Solid Green
Application running
Solid Yellow
Application loaded but not running (*) or BSP Upgrade mode active
Solid Red
Hardware Error (*)
Flashing Green
BSP startup phase. The controller needs time for starting.
Flashing Yellow
Application not loaded (*)
Flashing Yellow/Red
Fail safe mode (in case that the BSP upgrade was interrupted)
Flashing Red
BSP Error (software error*)
Flashing Red/Green
Application/BSP update or inizialization
(*) Contact Service.
Extension modules
BSP LED
Mode
Mode
Solid Green
BSP running
Communication running, I/O working
Solid Red
Hardware Error (*)
Communication down (*)
Flashing Red
BSP Error (*)
Communication running but parameter from the application
wrong or missing, or uncorrect factory calibration
Flashing Red/Green
BSP upgrade mode
Communication modules
BSP LED (same for all modules)
BSP LED
Mode
Solid Green
BPS running, communication with controller
Solid Yellow
BSP running, no communication with controller (*)
Solid Red
Hardware Error (*)
Flashing Red
BSP Error (*)
Flashing Red/Green
Application/BSP update
(*) Contact Service.
BUS LED
BUS LED
LON
Bacnet MSTP
Bacnet IP
Modbus
Solid Green
Ready for
Communication. (All
Parameter loaded,
Neuron configured).
Doesn't indicate a
communication with other
devices.
Ready for
Communication. The
BACnet Server is started.
It doesn't indicate an
active communication
Ready for
Communication. The
BACnet Server is started.
It doesn't indicate an
active communication
All Communication
running
Solid
Yellow
Startup
Startup
Startup. The LED stays
yellow until the module
receives a IP Address,
therefore a link must be
established.
Startup, or one configured
channel not
communicating to the
Master
Solid Red
No Communication to
Neuron (internal error,
could be solved by
downloading a new LON
application)
BACnet Server down.
Automatically a restart
after 3 seconds are
initiated.
BACnet Server down.
Automatic restart after 3
seconds is initiated.
All configured
Communications down.
Means no communication
to the Master. The timeout
can be configured. In case
that the timeout is zero the
timeout is disabled.
Flashing
Yellow
Communication not
possible to the Neuron.
The Neuron must be
configured and set online
over the LON Tool.
3.5 Controller maintenance
The controller requires to maintain the installed battery. Every two years it’s required to replace the battery. Battery model
is: BR2032 and it is produced by many different vendors.

Содержание

Скачать