Daikin EHY2KOMB28AA — общие меры безопасности для газового котла: установка и эксплуатация [6/48]
![Daikin EHY2KOMB28AA [6/48] General safety precautions](/views2/1746844/page6/bg6.png)
3 General safety precautions
Installation and operation manual
6
EHY2KOMB28+32AA
Daikin Altherma H Hybrid – Gas boiler module
4P538953-1A – 2020.02
▪ ONLY operate the gas boiler if a sufficient supply of combustion
air is ensured. In case of a concentric air/flue gas system
dimensioned according to the specifications of this manual, this is
fulfilled automatically and there are no other conditions for the
equipment installation room. This method of operation applies
exclusively.
▪ Store flammable fluids and materials at least 1meter away from
the gas boiler.
Do NOT install the unit in the following places:
▪ In potentially explosive atmospheres.
▪ In places where there is machinery that emits electromagnetic
waves. Electromagnetic waves may disturb the control system,
and cause malfunction of the equipment.
▪ In places where there is a risk of fire due to the leakage of
flammable gases (example: thinner or gasoline), carbon fibre,
ignitable dust.
▪ In places where corrosive gas (example: sulphurous acid gas) is
produced. Corrosion of copper pipes or soldered parts may cause
the refrigerant to leak.
▪ In bathrooms.
▪ In places where frost is possible. The ambient temperature around
the gas boiler should be >5°C.
3.2.3 Water
If applicable. See the installation manual or installer reference guide
of your application for more information.
NOTICE
Make sure water quality complies with EU directive
98/83EC.
Avoid damages caused by deposits and corrosion. To prevent
corrosion products and deposits, observe the applicable regulations
of technology.
Measures for desalination, softening or hardness stabilization are
necessary if the filling and top-up water have a high total hardness
(>3 mmol/l–sum of the calcium and magnesium concentrations,
calculated as calcium carbonate).
Using filling water and top-up water which does NOT meet the stated
quality requirements can cause a considerably reduced service life
of the equipment. The responsibility for this is entirely that of the
user.
3.2.4 Electrical
DANGER: RISK OF ELECTROCUTION
▪ Turn OFF all power supply before removing the
switch box cover, connecting electrical wiring or
touching electrical parts.
▪ Disconnect the power supply for more than 1 minute,
and measure the voltage at the terminals of main circuit
capacitors or electrical components before servicing.
The voltage MUST be less than 50 V DC before you
can touch electrical components. For the location of the
terminals, see the wiring diagram.
▪ Do NOT touch electrical components with wet hands.
▪ Do NOT leave the unit unattended when the service
cover is removed.
WARNING
If NOT factory installed, a main switch or other means for
disconnection, having a contact separation in all poles
providing full disconnection under overvoltage categoryIII
condition, MUST be installed in the fixed wiring.
WARNING
▪ ONLY use copper wires.
▪ Make sure the field wiring complies with the applicable
legislation.
▪ All field wiring MUST be performed in accordance with
the wiring diagram supplied with the product.
▪ NEVER squeeze bundled cables and make sure they
do NOT come in contact with the piping and sharp
edges. Make sure no external pressure is applied to the
terminal connections.
▪ Make sure to install earth wiring. Do NOT earth the unit
to a utility pipe, surge absorber, or telephone earth.
Incomplete earth may cause electrical shock.
▪ Make sure to use a dedicated power circuit. NEVER
use a power supply shared by another appliance.
▪ Make sure to install the required fuses or circuit
breakers.
▪ Make sure to install an earth leakage protector. Failure
to do so may cause electrical shock or fire.
▪ When installing the earth leakage protector, make sure
it is compatible with the inverter (resistant to high
frequency electric noise) to avoid unnecessary opening
of the earth leakage protector.
CAUTION
▪ When connecting the power supply: connect the earth
cable first, before making the current-carrying
connections.
▪ When disconnecting the power supply: disconnect the
current-carrying cables first, before separating the earth
connection.
▪ The length of the conductors between the power supply
stress relief and the terminal block itself must be as
such that the current-carrying wires are tautened before
the earth wire is in case the power supply is pulled
loose from the stress relief.
NOTICE
Precautions when laying power wiring:
▪ Do NOT connect wiring of different thicknesses to the
power terminal block (slack in the power wiring may
cause abnormal heat).
▪ When connecting wiring which is the same thickness,
do as shown in the figure above.
▪ For wiring, use the designated power wire and connect
firmly, then secure to prevent outside pressure being
exerted on the terminal board.
▪ Use an appropriate screwdriver for tightening the
terminal screws. A screwdriver with a small head will
damage the head and make proper tightening
impossible.
▪ Over-tightening the terminal screws may break them.
Install power cables at least 1m away from televisions or radios to
prevent interference. Depending on the radio waves, a distance of
1m may not be sufficient.
Содержание
- Daikin altherma h hybrid gas boiler module p.1
- Installation and operation manual p.1
- Ehy2komb28aa ehy2komb32aa p.1
- Ehy2komb28aa ehy2komb32aa p.2
- Director p.2
- Daikin tcf red 04 p.2
- Daikin tcf gar 01 p.2
- Daikin europe n v p.2
- Boiler efficiency 92 42 eec p.2
- Radio equipment 2014 53 eu p.2
- P369568 6j p.2
- Ostend 14th of march 2019 p.2
- Low voltage 2014 35 eu p.2
- Kiwa nb0063 p.2
- Installation and operation manual p.2
- Hiromitsu iwasaki p.2
- Gr0508 p.2
- Gas appliance regulation 2016 426 eu p.2
- En15502 1 2012 a1 2015 en60335 2 102 2016 en55014 1 2017 en55014 2 2015 en61000 3 2 2014 en61000 3 3 2013 etsi en300220 1 v3 etsi en300220 2 v3 p.2
- Benchmark places responsibilities on both manufacturers and installers the purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the p.3
- About the units and options 9 p.3
- About the product 3 p.3
- Troubleshooting 35 p.3
- About the product p.3
- The benchmark scheme p.3
- About the documentation 4 p.3
- Technical data 38 p.3
- About the box 8 p.3
- Table of contents p.3
- Operation 31 p.3
- Maintenance and service 32 p.3
- Installation 12 p.3
- Glossary 37 p.3
- General safety precautions 4 p.3
- Especially for uk p.3
- Disposal 45 p.3
- Configuration 25 p.3
- Commissioning 32 p.3
- General safety precautions p.4
- About this document p.4
- About the documentation p.4
- Meaning of warnings and symbols p.4
- Installation site p.5
- General safety precautions p.5
- General p.5
- For the installer p.5
- General safety precautions p.6
- Electrical p.6
- Local legislation p.7
- General safety precautions p.7
- Gas exhaust p.7
- To unpack the gas boiler p.8
- To remove the accessories from the gas boiler p.8
- Symbols on the package p.8
- Gas boiler p.8
- About the box p.8
- About the units and options p.9
- Possible options for the gas boiler p.9
- Identification label gas boiler p.9
- Identification p.9
- Combining units and options p.9
- About the units and options p.10
- About the units and options p.11
- To open the switch box cover of the gas boiler p.12
- To open the gas boiler p.12
- To install the gas boiler p.12
- Opening the unit p.12
- Mounting the gas boiler p.12
- Installation space requirements p.12
- Installation space p.12
- Installation p.12
- To install the condensate trap p.13
- Installation p.13
- To connect the water piping for domestic hot water not applicable for switzerland p.14
- Internal connections p.14
- Installation p.14
- External connections p.14
- Connecting water piping p.14
- Connecting the water piping of the gas boiler p.14
- Condensate pump p.14
- Condensate pipe work p.14
- To fill the domestic water circuit of the gas boiler p.15
- To connect the water piping for space heating p.15
- To connect the water piping for domestic hot water applicable for switzerland p.15
- Installation p.15
- Flow resistance graph for appliance domestic hot water circuit p.15
- Connecting the electrical wiring p.15
- Installation p.16
- Connecting the gas piping p.16
- To connect the main power supply of the gas boiler p.16
- To connect the gas pipe p.16
- To connect the electrical wiring to the gas boiler p.16
- To change the gas boiler to 80 125 concentric connection p.17
- To change the 60 100 concentric connection to a dual pipe connection p.17
- Installation p.17
- Connecting the boiler to the flue gas system p.17
- Installation p.18
- Calculate the total piping length p.18
- Appliance categories and pipe lengths p.18
- Installation p.19
- Installation p.20
- Installation p.21
- Flue pipe position p.21
- Applicable materials p.21
- Fitting a horizontal flue system p.22
- Plume management kit p.22
- Insulation of the gas exhaust and air intake p.22
- Installation p.22
- Fitting a vertical flue system p.22
- Installation p.23
- Flues in voids p.23
- Flue gas materials c63 available on the market p.23
- About securing the flue system p.23
- Installation p.24
- 3 50 mm m p.24
- 1000 mm p.24
- Overview configuration p.25
- Gas boiler p.25
- Finishing the gas boiler installation p.25
- Configuration p.25
- Basic configuration p.25
- To turn on off the gas boiler p.25
- To perform an air purge on the gas supply p.25
- To install the cover plate p.25
- To close the gas boiler p.25
- To set the parameters via the service code p.26
- To reset the gas boiler p.26
- Maximum space heating supply temperature p.26
- Keep hot function p.26
- Frost protection function p.26
- Domestic hot water temperature p.26
- Domestic hot water comfort function p.26
- Configuration p.26
- Configuration p.27
- Maximum space heating power setting p.28
- Frost protection function p.28
- Configuration p.28
- To change to a different type of gas p.29
- Configuration p.29
- About the co ₂ setting p.29
- Configuration p.30
- Overview operation p.31
- Operation modes p.31
- Operation p.31
- Heating p.31
- Domestic hot water p.31
- To perform a test run on the gas boiler p.32
- To perform a gas pressure test p.32
- To disassemble the gas boiler p.32
- Opening the gas boiler p.32
- Maintenance safety precautions p.32
- Maintenance and service p.32
- Commissioning p.32
- Maintenance and service p.33
- To clean the inside of the gas boiler p.34
- To assemble the gas boiler p.34
- Maintenance and service p.34
- Troubleshooting p.35
- Symptom the burner ignites noisily p.35
- Symptom the burner does not ignite p.35
- Solving problems based on symptoms p.35
- Precautions when troubleshooting p.35
- General guidelines p.35
- Symptom no domestic hot water p.36
- Symptom hot water does not reach the temperature tank installed p.36
- Symptom hot water does not reach the temperature no tank installed p.36
- Solving problems based on error codes p.36
- Error codes overview p.36
- Error codes of the gas boiler p.36
- Troubleshooting p.36
- Symptom the power is reduced p.36
- Symptom the burner resonates p.36
- Symptom space heating does not reach the temperature p.36
- Symptom no space heating by the gas boiler p.36
- Glossary p.37
- Technical data p.38
- Components gas boiler p.38
- Components p.38
- Bottom view p.38
- A subset of the latest technical data is available on the regional daikin website publicly accessible the full set of latest technical data is available on the daikin business portal authentication required p.38
- Wiring diagram p.39
- Technical specifications gas boiler p.39
- Technical specifications p.39
- Technical data p.39
- General p.39
- Wiring diagram gas boiler p.39
- Technical data p.40
- Energy related products specifications p.40
- Technical data p.41
- Gas category and supply pressure p.41
- Technical data p.42
- This commissioning checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate building regulations and then handed to the customer to keep for future reference p.43
- Technical data p.43
- Installation and operation manual p.43
- Gas boiler system commissioning checklist p.43
- Ehy2komb28 32aa daikin altherma h hybrid gas boiler module 4p538953 1a 2020 2 p.43
- Service 01 p.44
- P538953 1a 2020 2 p.44
- Installation and operation manual p.44
- Ehy2komb28 32aa p.44
- Daikin altherma h hybrid gas boiler module p.44
- Technical data p.44
- Service record p.44
- Service 10 p.44
- Service 09 p.44
- Service 08 p.44
- Service 07 p.44
- Service 06 p.44
- Service 05 p.44
- Service 04 p.44
- Service 03 p.44
- Service 02 p.44
- Disposal p.45
Похожие устройства
-
Daikin EVLQ08CAV3Руководство по применению для установщика -
Daikin EVLQ08CAV3Справочное руководство для монтажника -
Daikin EVLQ08CAV3Общие правила техники безопасности -
Daikin EVLQ08CAV3Инструкция по монтажу -
Daikin EVLQ05CAV3Справочное руководство для монтажника -
Daikin EVLQ05CAV3Руководство по применению для установщика -
Daikin EVLQ05CAV3Общие правила техники безопасности -
Daikin EVLQ05CAV3Инструкция по монтажу -
Daikin EHYKOMB33AA3Справочное руководство для монтажника -
Daikin EHYKOMB33AA3Руководство по применению для установщика -
Daikin EHYKOMB33AA3Руководство по эксплуатации -
Daikin EHYKOMB33AA2Руководство по применению для установщика
Узнайте о мерах безопасности при установке и эксплуатации газового котла. Следуйте рекомендациям для предотвращения аварий и продления срока службы оборудования.