Daikin RXS60E3V1B [136/150] Part 8 trial operation and field settings

Daikin RXS60E3V1B [136/150] Part 8 trial operation and field settings
SiBE07-618_D
126 Trial Operation and Field Settings
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................127
2. Forced Cooling Operation Mode .........................................................128
3. Trial Operation ....................................................................................129
4. Field Settings ......................................................................................130
4.1 When 2 Units are Installed in 1 Room..................................................130
4.2 Facility Setting Switch (cooling at low outdoor temperature)................131
4.3 Jumper and Switch Settings.................................................................131
5. Application of Silicon Grease to a Power Transistor and a
Diode Bridge .......................................................................................132

Содержание

Скачать