Flex SBG 4910 [18/222] Before switching on the power tool

Flex SBG 4910 [18/222] Before switching on the power tool
SBG 4910
18
Instructions for use
t^okfkd>
_ÉÑçêÉ=~ÇàìëíáåÖÜÉçïÉêççäI=~äï~óëêÉëë=
íÜÉ=ã~áå=ëïáíÅÜ=lÑÑLM=EOPFK
Before switching on the power
tool
Unpack the metal band saw and check
that no parts are missing or damaged.
Compare the mains voltage with the
specifications on the rating plate (5).
Assembling the metal band saw:
Place dovetail guide (9) in the uppermost
position.
Insert saw into the dovetail guide.
Tighten wing nut (11) to secure the saw.
Fold saw down.
Transport and installation
Lift the machine onto the machine
table (17).
or
Insert locking pin (13) into the opening
on the swivel support (12) and raise
the power tool on the saw frame (6).
`^rqflk>
tÜÉå=ëÉäÉÅíáåÖ=íÜÉ=áåëí~ää~íáçå=äçÅ~íáçåI=
ÉåëìêÉ=íÜ~í=íÜÉ=áåëí~ää~íáçå=ëìêÑ~ÅÉ=áë=
~ÇÉèì~íÉäó=ëí~ÄäÉ=~åÇ=íÜ~í=íÜÉêÉ=áë=ëìÑÑáÅáÉåí=
äáÖÜíK
klqb>
qÜÉ=ÉêÖçåçãáÅ~ääó=çéíáãìã=ïçêâáåÖ=ÜÉáÖÜí=
áë VMÓVR=ÅãK

Содержание

en SBG4910 Instructions for use Transport and installation WARNING Lift the machine onto the machine table 17 Before adjusting the power tool always press the main switch Off O 23 or Before switching on the power tool Unpack the metal band saw and check that no parts are missing or damaged Compare the mains voltage with the specifications on the rating plate 5 Assembling the metal band saw Place dovetail guide 9 in the uppermost position Insert locking pin 13 into the opening on the swivel support 12 and raise the power tool on the saw frame 6 A CAUTION When selecting the installation location ensure that the installation surface is adequately stable and that there is sufficient light T NOTE Insert saw into the dovetail guide Tighten wing nut 11 to secure the saw Fold saw down 18 The ergonomically optimum working height is 90 95 cm

Скачать