Daikin EHSXB08P50A — installation and Maintenance Guide for Integrated Heat Pump Systems [20/68]

Превью страниц Страница 20 / 68
Daikin EHSHB08P50A [20/68] Removing the protective cover
Installation and maintenance manual
20
Daikin Altherma EHS(X/H)
Daikin Solar tank with integrated interior heat pump unit
008.1420744 – 06/2015
3 x Set-up and installation
3.4.6 Connection assignment, circuit board RoCon BM1
Fig. 3-12 Circuit board RoCon BM1 (masic control module)
Mains supply 230 V, 50 Hz
(Connection plan in this instruction manual)
3.4.7 Mains connection Daikin Altherma EHS(X/H)
A flexible cable for the mains connection is already connected in-
ternal to the device.
Check the supply voltage (~230 V, 50 Hz).
D
isconnect the junction box of the domestic installation.
C
onnect the cable for the mains connection on the Daikin
Altherma EHS(X/H) to the junction box of the domestic instal-
lation via an all-pole disconnecting main switch to be installed
b
y the customer (separate isolator according to EN 60335-1).
Ensure that the polarity is correct.
The exterior unit and optional accessories must be connected
separately to
the regulator on the Daikin Altherma EHS(X/H). To
do so, the cover panel of the Daikin Altherma EHS(X/H) must be
removed (see section 3.4.8) and, if necessary, the control
housing opened (see section 3.4.9).
3.4.8 Removing the protective cover
Fig. 3-13 Unscrew/loosen screws, lift the cover at the back and remove
in a forwards direction.

Содержание

257

Discover essential steps for installing and maintaining integrated heat pump systems. Ensure proper connections and safety measures for optimal performance.